Las Mujeres Solar (ERCOT-29INR0154) — Project Summary

Queue ID
ERCOT-29INR0154
Capacity
684.33 MW
Technology
Solar
Status
active
Location
Jim Hogg, TX
Region
ERCOT
Developer
Las Mujeres Solar, LLC
IA Status
—

Las Mujeres Solar

ERCOT-29INR0154BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

684.33 MW generation in Jim Hogg, TX · In queue since May 2026 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

684.33 MW

Capacity

0

Components

5 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 7m

Pre-Study0%
Queue EntryMay 13, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
2029-12-01
From queue filing
Developer
—
From queue filing
Status
Active
Active in ERCOT queue with no interconnection agreement (IA); the project is early-stage, and ercotqueue.com gives a 7% build-chance estimate. No construction or permitting news found.
Financing
Unannounced
About

Las Mujeres Solar is a proposed photovoltaic solar generation project located in Jim Hogg County, Texas. The development project is being advanced by Las Mujeres Solar, LLC and has a total planned capacity of 684.33 megawatts (MW). It is designed to connect to the grid at the Cruces 7A substation (Bus #80079), which serves as its point of interconnection.

The project is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-29INR0154. It entered the queue on May 13, 2026, and currently holds an active status. The proposed commercial operation date is December 1, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Jim Hogg

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Las Mujeres Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Cruces 7A (Bus #80079)

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.