Sundance Solar (ERCOT-29INR0122) — Project Summary

Queue ID
ERCOT-29INR0122
Capacity
301 MW
Technology
Solar
Status
suspended
Location
Knox, TX
Region
ERCOT
Developer
Sundance Solar, LLC
IA Status
Facility Study

Sundance Solar

ERCOT-29INR0122BetaSuspendedSolarERCOTLBNL + Live

301 MW generation in Knox, TX · In queue since April 2025 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301 MW

Capacity

1

Components

Solar

1y 7m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Suspended50%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-18

Queue history
29INR0122 · 13 monthly ERCOT reports, Apr 2025 – Apr 2026

Projected COD moved

0 times

Jul 2029 → Jul 2029

Net change

0 months

first report to latest

Capacity

301 MW

unchanged in the reports

Latest stage

Screening started

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 21, 2025
On ERCOT's inactive listMay 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jul 18, 2029
From queue filing
Developer in saved assessment
Sundance Solar, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no public announcements on construction timeline or financing
Financing
Not recorded

Milestones in this assessment

IA executedApr 21, 2025Latest in this assessment

Entered ERCOT queue, Facility Study stage

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of July 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing identifies developer as 'Sundance Solar, LLC'. No news coverage or corporate announcements found to identify parent company or confirm this is an operating entity versus project SPV.

Status: LBNL shows active queue position in Facility Study phase. Absence of any news coverage suggests early-stage development with no major milestones announced.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sundance Solar is a proposed 301 MW solar generation project in Knox County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The development project is being pursued by Sundance Solar, LLC and consists entirely of solar photovoltaic capacity, with no co-located storage or other components listed. The project would interconnect at a point on the 345 kV transmission line between the Foxtail substation (#6076) and the Perigee substation (#60791).

The project entered the ERCOT interconnection queue on April 21, 2025, under queue ID ERCOT-29INR0122. Its proposed commercial operation date is July 18, 2029. Its interconnection agreement process is at the Facility Study stage, but the project's overall queue status is listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Knox

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sundance Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

(#6076) Foxtail - (#60791) Perigee 345kV Line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.