Cash Mills Storage Center
200.66 MW storage in Mills, TX · In queue since November 2024 · Proposed COD June 2029
200.66 MW
Capacity
1
Components
Battery
2 years
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
Projected COD moved
0 times
Jun 2029 → Jun 2029
Net change
0 months
first report to latest
Capacity
201 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT queue at Facility Study phase
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of June 2029. No independent news or press releases found to validate or contradict this target date.
Developer: LBNL lists 'Mills Storage Center' as developer, which appears to be a project-specific entity given the naming convention matching the project name. No press releases or corporate announcements found to identify a parent operating company.
Status: LBNL status shows Active with Facility Study phase as of November 2024 queue entry. No news coverage found to indicate construction activity, financing, or status changes.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Cash Mills Storage Center is a proposed battery energy storage development project located in Mills County, Texas. Developed by Mills Storage Center, the standalone storage project has a total proposed capacity of 200.66 megawatts (MW), consisting entirely of battery storage. The project is planned to interconnect at a tap line between the Evant substation (bus #7068) and the Goldthwaite substation (bus #7070).
The project is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-29INR0065. It entered the queue on November 26, 2024, and holds an active status. As of the latest available data, the project is in the Facility Study phase of the interconnection process. Its proposed commercial operation date is June 1, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Mills
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Mills Storage Center
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap Line between Evant (bus#7068) and Goldthwaite (Bus# 7070)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.