Palomino Solar (ERCOT-29INR0056) — Project Summary

Queue ID
ERCOT-29INR0056
Capacity
301.2 MW
Technology
Solar+Battery
Status
active
Location
Hopkins, TX
Region
ERCOT
Developer
Palomino Renewables
IA Status
Facility Study

Palomino Solar

ERCOT-29INR0056BetaActiveSolarBatteryERCOTLBNL + Live

301.2 MW hybrid in Hopkins, TX · In queue since October 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.2 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Facilities Study50%
Queue EntryOct 18, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Queue history
29INR0056 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

1 time

Jun 2029 → Dec 2028

Net change

-6 months

first report to latest

Capacity

301 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 18, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
Palomino Renewables
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no executed interconnection agreement. ercotqueue.com lists a 2% build-chance. No construction or financing signals were found.
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. ercotqueue.com/project/29INR0056

Commercial operation date: Only the LBNL/ERCOT queue filing gives a COD (2028-12-31) for the Hopkins County, TX project. The Innergex 'Palomino Solar Energy Project' in the search results is a 200 MW project in Highland County, Ohio, which is a different project and was excluded.

Developer: The LBNL filing and the ercotqueue.com tracker both name Palomino Renewables, but the tracker likely repeats the ERCOT filing, so this is not independent confirmation. No parent company or ownership change was found for the TX project. Innergex is the developer of the Ohio project and is unrelated.

Status: LBNL lists the project as active with a Facility Study IA status and no IA date. ercotqueue.com confirms 'Currently No IA'. No news indicates withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Palomino Solar is a proposed hybrid solar and battery storage development project in Hopkins County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Palomino Renewables, the project has a total proposed capacity of 301.2 megawatts (MW). Its listed components include a 301.2 MW solar photovoltaic facility, and the project is also identified as including battery storage, though a separate capacity for the battery component is not specified in the available data.

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-29INR0056, having entered the queue on October 18, 2024. Its status is active, and it is in the Facility Study phase of the interconnection process. The proposed point of interconnection is a tap on the 345 kV transmission line between the Monticello (1695) and Sulphur Springs (1697) substations. The developer has proposed a commercial operation date of December 31, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hopkins

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Palomino Renewables

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 1695 Monticello - 1697 Sulphur Springs

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Monticello substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.