Palomino Solar
301.2 MW hybrid in Hopkins, TX · In queue since October 2024 · Proposed COD December 2028
301.2 MW
Capacity
1
Components
Solar
2y 1m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
Projected COD moved
1 time
Jun 2029 → Dec 2028
Net change
-6 months
first report to latest
Capacity
301 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only the LBNL/ERCOT queue filing gives a COD (2028-12-31) for the Hopkins County, TX project. The Innergex 'Palomino Solar Energy Project' in the search results is a 200 MW project in Highland County, Ohio, which is a different project and was excluded.
Developer: The LBNL filing and the ercotqueue.com tracker both name Palomino Renewables, but the tracker likely repeats the ERCOT filing, so this is not independent confirmation. No parent company or ownership change was found for the TX project. Innergex is the developer of the Ohio project and is unrelated.
Status: LBNL lists the project as active with a Facility Study IA status and no IA date. ercotqueue.com confirms 'Currently No IA'. No news indicates withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Palomino Solar is a proposed hybrid solar and battery storage development project in Hopkins County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Palomino Renewables, the project has a total proposed capacity of 301.2 megawatts (MW). Its listed components include a 301.2 MW solar photovoltaic facility, and the project is also identified as including battery storage, though a separate capacity for the battery component is not specified in the available data.
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-29INR0056, having entered the queue on October 18, 2024. Its status is active, and it is in the Facility Study phase of the interconnection process. The proposed point of interconnection is a tap on the 345 kV transmission line between the Monticello (1695) and Sulphur Springs (1697) substations. The developer has proposed a commercial operation date of December 31, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hopkins
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Palomino Renewables
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1695 Monticello - 1697 Sulphur Springs
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Monticello substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.