Aurelius Solar (ERCOT-29INR0003) — Project Summary

Queue ID
ERCOT-29INR0003
Capacity
1124.24 MW
Technology
Solar
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
IP Roman, LLC
IA Status
IA Executed

Aurelius Solar

ERCOT-29INR0003BetaActiveSolarERCOTLBNL + Live

1,124.24 MW generation in Deaf Smith, TX · In queue since July 2023 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,124.24 MW

Capacity

1

Components

Solar

3y 4m

In Queue

IA Executed

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 3m

IA → COD

2y 8m

Total Duration

2y 3m

Construction75%
Queue EntryJul 18, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 9, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-06-30

Queue history
29INR0003 · 39 monthly ERCOT reports, Jul 2023 – Sep 2026

Projected COD moved

2 times

Dec 2029 → Jun 2028

Net change

-18 months

first report to latest

Capacity

1124 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 18, 2023
Facilities study approvedSep 22, 2025
Interconnection agreement signedOct 9, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2028
From queue filing
Developer in saved assessment
Intersect Power
Filed as IP Roman, LLC
Status at research time
IA Executed
Active in the ERCOT queue with the interconnection agreement executed 2025-10-09 and the facilities study complete. No construction start or financing close has been announced.
Financing
Not recorded

Milestones in this assessment

IA executedOct 9, 2025Latest in this assessment

Interconnection agreement executed per the LBNL snapshot; ercotqueue.com confirms IA and facilities study are complete.

ercotqueue.com
Research sources and reasoning (7 recorded sources)

medium confidence at research time

  1. ercotqueue.com/project/29INR0003
  2. interconnection.fyi/project/ercot-29inr0003
  3. cleanview.co/power-projects/planned/solar-farms/texas/29INR0003/aurelius-solar
  4. cleanview.co/power-projects/developers/intersect-power
  5. aterio.io/insights/us-power-generation/ep/aurelius-64766
  6. abc7amarillo.com/news/local/deaf-smith-county-commission-clears-way-for-hydrogen-plant-wind-farm-solar-farm-intersect-power
  7. abc7amarillo.com/news/local/intersect-powers-1-billion-project-ignites-tax-debate-in-gray-county-commission-court

Commercial operation date: LBNL lists a 2028-06-30 proposed COD. Cleanview says 'Expected online 2028' and Aterio shows activation around Sep 2028, so nothing contradicts it. These aggregator dates are probably derived from the queue data, not an independent developer-stated target. Interxdata's 'operational' label conflicts with every other source and is disregarded.

Developer: LBNL and ERCOT trackers list the filing entity IP Roman, LLC, which is consistent with an Intersect Power project LLC. Cleanview's Intersect Power pipeline page lists Aurelius Solar (1,124 MW, TX), and KVII coverage ties Intersect to Panhandle solar, wind and hydrogen development. No source here documents a later ownership change.

Status: LBNL shows status active with an IA executed on 2025-10-09, and ercotqueue.com confirms 'IA + FIS complete'. The Interxdata 'operational' label is contradicted by LBNL (is_operational false) and by the 2028 COD, so it is treated as an error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Aurelius Solar project is a proposed 1124.24 MW solar generation facility in Deaf Smith County, Texas. The project, being developed by IP Roman, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0003, with a queue entry date of July 18, 2023. The proposed commercial operation date is June 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The Aurelius Solar project has been featured in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Deaf Smith

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

IP Roman, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

23908 Deaf Smith station 345 kV

Data Source

LBNL + Live

DeveloperIntersect PowerKVII · 2024-01-15
TransactionProject financingKVII · 2024-01-15
Deal value$1.0BKVII · 2024-01-15
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Deaf Smith #6 Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.