Aurelius Solar
1,124.24 MW generation in Deaf Smith, TX · In queue since July 2023 · Proposed COD June 2028
1,124.24 MW
Capacity
1
Components
Solar
3y 4m
In Queue
IA Executed
IA Phase
Signed Oct 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 3m
IA → COD
2y 8m
Total Duration
2y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2028-06-30
Projected COD moved
2 times
Dec 2029 → Jun 2028
Net change
-18 months
first report to latest
Capacity
1124 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed per the LBNL snapshot; ercotqueue.com confirms IA and facilities study are complete.
ercotqueue.comResearch sources and reasoning (7 recorded sources)
medium confidence at research time
- ercotqueue.com/project/29INR0003
- interconnection.fyi/project/ercot-29inr0003
- cleanview.co/power-projects/planned/solar-farms/texas/29INR0003/aurelius-solar
- cleanview.co/power-projects/developers/intersect-power
- aterio.io/insights/us-power-generation/ep/aurelius-64766
- abc7amarillo.com/news/local/deaf-smith-county-commission-clears-way-for-hydrogen-plant-wind-farm-solar-farm-intersect-power
- abc7amarillo.com/news/local/intersect-powers-1-billion-project-ignites-tax-debate-in-gray-county-commission-court
Commercial operation date: LBNL lists a 2028-06-30 proposed COD. Cleanview says 'Expected online 2028' and Aterio shows activation around Sep 2028, so nothing contradicts it. These aggregator dates are probably derived from the queue data, not an independent developer-stated target. Interxdata's 'operational' label conflicts with every other source and is disregarded.
Developer: LBNL and ERCOT trackers list the filing entity IP Roman, LLC, which is consistent with an Intersect Power project LLC. Cleanview's Intersect Power pipeline page lists Aurelius Solar (1,124 MW, TX), and KVII coverage ties Intersect to Panhandle solar, wind and hydrogen development. No source here documents a later ownership change.
Status: LBNL shows status active with an IA executed on 2025-10-09, and ercotqueue.com confirms 'IA + FIS complete'. The Interxdata 'operational' label is contradicted by LBNL (is_operational false) and by the 2028 COD, so it is treated as an error.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Aurelius Solar project is a proposed 1124.24 MW solar generation facility in Deaf Smith County, Texas. The project, being developed by IP Roman, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0003, with a queue entry date of July 18, 2023. The proposed commercial operation date is June 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The Aurelius Solar project has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Deaf Smith
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
IP Roman, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
23908 Deaf Smith station 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Deaf Smith #6 Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesAurelius 2 Solar Solar queue pipeline — 1 projects by technology and status
Data-driven briefing on Aurelius Solar — fleet, generation, financial, and news signals.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.