Anawa La Gas (ERCOT-28INR0524) — Project Summary

Queue ID
ERCOT-28INR0524
Capacity
250 MW
Technology
Gas
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
Anawa La Solar LLC
IA Status
—

Anawa La Gas

ERCOT-28INR0524BetaActiveGasCombined-CycleERCOTLive · ERCOT

250 MW generation in Hidalgo, TX · In queue since June 2026 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

250 MW

Capacity

0

Components

4 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

Pre-Study0%
Queue EntryJun 24, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-30

About

Anawa La Gas is a proposed 250 MW natural gas-fired generation project located in Hidalgo County, Texas. The development project is being advanced by Anawa La Solar LLC and is designed to use combined-cycle gas technology. The project would interconnect to the grid at a point of interconnection identified as the Liston 138 kV to Bates 138 kV line.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier ERCOT-28INR0524 and holds an active status. It entered the queue on June 24, 2026, and has a proposed commercial operation date of December 30, 2028. The available queue data does not report the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Anawa La Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Liston 138 KV to Bates 138 KV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Anawa La Gas
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.