SunRustler Solar (ERCOT-28INR0520) — Project Summary

Queue ID
ERCOT-28INR0520
Capacity
301.49 MW
Technology
Solar
Status
active
Location
Culberson, TX
Region
ERCOT
Developer
SunRustler Solar
IA Status
—

SunRustler Solar

ERCOT-28INR0520BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

301.49 MW generation in Culberson, TX · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.49 MW

Capacity

0

Components

—

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection
Pre-Study0%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-15

Cross-source intelligence
Beta
Low confidence·5 sources·as of 2026-10-25
Expected COD
2028-06-15
From queue filing
Developer
OCI Energy
Filed as SunRustler Solar
Status
Active
Active in the ERCOT queue. Project-entity filings in 2026 (Delaware LLC on 2026-04-13, Texas foreign registration on 2026-06-09) suggest development is continuing, but no construction or financing news was found.
Financing
Unannounced
About

SunRustler Solar is a proposed photovoltaic solar generation project located in Culberson County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The development project has a total planned capacity of 301.49 MW and is listed under the developer name SunRustler Solar. It is designed as a standalone solar generation facility using photovoltaic technology, with no associated storage component identified in the available data.

The project is registered in the ERCOT interconnection queue under queue ID ERCOT-28INR0520 and currently holds an active status. Its proposed point of interconnection is the 11082 MAVRKDRW_8 138 kV substation. The project has a proposed commercial operation date of June 15, 2028. The available records do not specify a queue entry date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Culberson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SunRustler Solar

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

11082 MAVRKDRW_8 138kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about SunRustler Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.