Young Road Solar (ERCOT-28INR0514) — Project Summary

Queue ID
ERCOT-28INR0514
Capacity
101.7 MW
Technology
Solar
Status
active
Location
Baylor, TX
Region
ERCOT
Developer
reNRG TX 5 LLC
IA Status
—

Young Road Solar

ERCOT-28INR0514BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

101.7 MW generation in Baylor, TX · In queue since May 2026 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.7 MW

Capacity

0

Components

5 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 11m

Pre-Study0%
Queue EntryMay 11, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-30

About

Young Road Solar is a proposed photovoltaic solar generation project located in Baylor County, Texas. Developed by reNRG TX 5 LLC, the project has a total planned capacity of 101.7 megawatts (MW). It is listed under queue ID ERCOT-28INR0514 in the interconnection queue administered by the Electric Reliability Council of Texas (ERCOT).

The project entered the ERCOT interconnection queue on May 11, 2026, and its status is currently active. It has a proposed commercial operation date of April 30, 2028. The planned point of interconnection would tap a 69 kV transmission line and create a new bus between the Westover (784) and Lake Kemp Switch (782) 69 kV substations.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Baylor

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

reNRG TX 5 LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

The POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) 69 KV SUB STATIONS.

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Young Road Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.