Rancho Grande Solar (ERCOT-28INR0503) — Project Summary

Queue ID
ERCOT-28INR0503
Capacity
251.58 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Bordas Renewable Energy, LLC
IA Status
—

Rancho Grande Solar

ERCOT-28INR0503BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

251.58 MW generation in Zapata, TX · In queue since April 2026 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.58 MW

Capacity

0

Components

7 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 1m

Pre-Study0%
Queue EntryApr 2, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-09

Queue history
28INR0503 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

0 times

May 2028 → May 2028

Net change

0 months

first report to latest

Capacity

252 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 2, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 9, 2028
From queue filing
Developer in saved assessment
Bordas Renewable Energy, LLC
From queue filing
Status at research time
Active
Active — queue position secured as of April 2026, no public announcements on construction timeline or financing
Financing
Not recorded

Milestones in this assessment

IA executedApr 2, 2026Latest in this assessment

Project entered ERCOT interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of May 2028. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists Bordas Renewable Energy, LLC as developer. No news coverage found to identify if this is a shell LLC or operating entity, or to reveal any parent company structure.

Status: LBNL status shows active queue position entered April 2026. Absence of news coverage suggests early-stage development with no major milestones announced yet.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Rancho Grande Solar is a proposed photovoltaic solar generation project located in Zapata County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Bordas Renewable Energy, LLC, the project has a planned total capacity of 251.58 megawatts (MW). It is proposed to connect to the grid at the 345 kV Tiempo Substation (#80224).

The project is listed in the ERCOT interconnection queue under the identifier ERCOT-28INR0503 and entered the queue on April 2, 2026. Its interconnection request is currently active, and it has a proposed commercial operation date of May 9, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bordas Renewable Energy, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Tiempo Substation #80224

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Substation 41

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.