Blue Kite (ERCOT-28INR0496) — Project Summary

Queue ID
ERCOT-28INR0496
Capacity
370.08 MW
Technology
Gas
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
RWE Clean Energy Development, LLC
IA Status
—

Blue Kite

ERCOT-28INR0496BetaActiveGasCombustion (gas) TurbineERCOTLive · ERCOT

370.08 MW generation in San Patricio, TX · In queue since March 2026 · Proposed COD August 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

370.08 MW

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Pre-Study0%
Queue EntryMar 10, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-08-29

Queue history
28INR0496 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

1 time

Dec 2028 → Aug 2030

Net change

+20 months

first report to latest

Capacity

370 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 10, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 29, 2030
From queue filing
Developer in saved assessment
RWE Clean Energy
Filed as RWE Clean Energy Development, LLC
Status at research time
Active
Active in the ERCOT queue with no interconnection agreement (IA) yet; ercotqueue.com lists a 7% build-chance. No construction, permitting or financing news found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. ercotqueue.com/project/28INR0496
  2. ercotqueue.com/developer/rwe
  3. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/28INR0496/blue-kite
  4. interconnection.fyi/projects/state/TX
  5. infrasure.ai/browse/owner/rwe-clean-energy

Commercial operation date: Only LBNL gives a proposed COD of 2030-08-29. Cleanview repeats 'August 2030', but it appears to be derived from the same queue data, so it is not independent confirmation. No developer press release or news article gives a separate target.

Developer: The LBNL filing entity is RWE Clean Energy Development, LLC. ERCOT queue aggregators attribute Blue Kite to RWE and list it in RWE's portfolio, so the operating parent is RWE Clean Energy. No independent press release was found, and no ownership change is indicated.

Status: LBNL lists the project as active, and ercotqueue.com and interconnection.fyi both show it Active with no IA. Nothing in the search results contradicts this.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Blue Kite is a proposed natural gas-fired generation project in San Patricio County, Texas, being developed by RWE Clean Energy Development, LLC. The development project would use combustion (gas) turbine technology and has a total planned capacity of 370.08 MW. It would connect to the grid at the Whitepoint 345 kV substation (Bus #8956).

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier ERCOT-28INR0496 and entered the queue on March 10, 2026. Its status is active, and its proposed commercial operation date is August 29, 2030. The available data does not specify the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Clean Energy Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

<Bus#8956> <WHITEPOINT> <345KV>

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.