Wilson Gas Plant
402.88 MW generation in Wilson, TX · In queue since March 2026 · Proposed COD June 2028
402.88 MW
Capacity
0
Components
8 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Projected COD moved
0 times
Jun 2028 → Jun 2028
Net change
0 months
first report to latest
Capacity
403 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- ercotqueue.com/project/28INR0494
- substationscout.com/ercot/project/28inr0494-wilson-gas-plant/
- quicksandcheck.com/texas/wilson-county/
- interconnection.fyi/project/ercot-28inr0494
Commercial operation date: Only queue-derived sources exist. LBNL lists proposed COD 2028-06-30, and the Quicksand Check ERCOT-derived listing shows 'Jun 2028'. These are not independent of the queue filing, and no developer press release or news provides a different target.
Developer: Misae Gas Power appears in the LBNL filing and in ERCOT-queue aggregators, which just repeat the queue data. No press release or corporate source identifies a parent or operating company.
Status: LBNL shows active. Aggregators (substationscout, ercotqueue.com, Quicksand Check Sept 2026 ERCOT report) confirm active, no IA, facility study underway. No evidence of construction or withdrawal.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Wilson Gas Plant is a proposed natural gas-fired generation project in Wilson County, Texas, being developed by Misae Gas Power. The development project has a total proposed capacity of 402.88 MW and would use internal combustion technology. It would connect to the transmission system through a tap on two 345 kV circuits, Circuit 1 and Circuit 2 of the Elm Creek (5133) to Miguel (5901) line.
The project is in the interconnection queue administered by the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-28INR0494. It entered the queue on March 10, 2026, and its status is listed as active. The proposed commercial operation date is June 30, 2028. The available data does not indicate the status of an interconnection agreement.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wilson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Misae Gas Power
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 5133 ELMCREEK - 5901 MIGUEL5 CKT 1 Tap 345 kV 5133 ELMCREEK - 5901 MIGUEL5 CKT 2
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.