Tri-X BESS 1 SLF
205.3 MW generation in Crane, TX · In queue since August 2025 · Proposed COD December 2027
205.3 MW
Capacity
1
Components
Battery
11 months
In Queue
Facility Study
IA Phase
COD target: 2027
Total Duration
2y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
Entered ERCOT queue at Facility Study stage
The Tri-X BESS 1 SLF project is a proposed 205.3 MW hybrid battery energy storage system located in Crane County, Texas. The project, developed by Crane I Solar Electric, LLC, is interconnected within the ERCOT region under queue ID ERCOT-28INR0389. The project entered the interconnection queue on August 18, 2025, with a proposed commercial operation date of December 1, 2027.
The Tri-X BESS 1 SLF project is listed as an active project in the ERCOT interconnection queue. The point of interconnection is the 138 kV Soda Lake substation (#76026). The project has appeared in recent news coverage regarding energy storage development in Texas.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Crane
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Crane I Solar Electric, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV Soda Lake (#76026)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Tri-X BESS 1 SLFForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.