Wichita Creek Storage (ERCOT-28INR0378) — Project Summary

Queue ID
ERCOT-28INR0378
Capacity
300 MW
Technology
Battery
Status
active
Location
Wichita, TX
Region
ERCOT
Developer
Wichita Solar II, LLC
IA Status
—

Wichita Creek Storage

ERCOT-28INR0378BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

300 MW hybrid in Wichita, TX · In queue since August 2026 · Proposed COD April 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

300 MW

Capacity

0

Components

2 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Pre-Study0%
Queue EntryAug 21, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-15

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-10-25
Expected COD
2030-04-15
From queue filing
Developer
Wichita Solar II, LLC
From queue filing
Status
Active
Active in the ERCOT queue (28INR0378), in interconnection study, tapping the 345 kV Riley–Krum West line. No IA, financing or construction signals found.
Financing
Unannounced
About

Wichita Creek Storage (queue ID ERCOT-28INR0378) is a proposed battery energy storage development project located in Wichita County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project has a total proposed capacity of 300 MW and is classified as a hybrid project, with technology components listed as battery energy storage and an additional component categorized as "Other." Individual capacities for each component are not specified in the available data. The project is being developed by Wichita Solar II, LLC.

The project entered the ERCOT interconnection queue on August 21, 2026, and currently holds an active status. Its proposed point of interconnection is a tap on the 345 kV Riley (6111) to Krum West (1730) Circuit 1 transmission line. The developer has targeted a commercial operation date of April 15, 2030. Information on the status of an interconnection agreement is not available in the provided data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wichita

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Wichita Solar II, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ELECTRAW_1_2
POI Substation
Riley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Wichita Creek Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.