River Boat Power Gas Plant
334.36 MW generation in Mitchell, TX · In queue since August 2025 · Proposed COD June 2028
334.36 MW
Capacity
1
Components
Gas
1y 3m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Projected COD moved
1 time
Jun 2028 → Aug 2029
Net change
+14 months
first report to latest
Capacity
334 MW
unchanged in the reports
Latest stage
Screening started
last listed Apr 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Texas Public Utility Commission approval referenced in news extraction
canarymedia.comResearch sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only LBNL queue data provides a COD target of August 2029. No independent news sources or press releases found to validate or contradict this date.
Developer: Champion Creek Power, LLC appears to be the operating entity with no evidence of a shell-LLC structure or parent company. No news coverage found to identify alternative ownership.
Status: LBNL status shows 'active' with Facility Study underway. News extraction references Texas PUC approval but provides no project-specific timeline or construction updates.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The River Boat Power Gas Plant is a proposed 334.36 MW natural gas-fired generation project in Mitchell County, Texas. The development project is being advanced by Champion Creek Power, LLC and would connect to the grid at a tap on the 345 kV line between the Cattlemen and Gasconades Creek substations. The project consists of a single gas generation component accounting for its full capacity.
The project entered the Electric Reliability Council of Texas (ERCOT) interconnection queue on August 18, 2025, under queue ID ERCOT-28INR0351. It has a proposed commercial operation date of June 30, 2028. Its interconnection agreement status is listed at the Facility Study stage, though the project's overall queue status is currently recorded as suspended. The project has appeared in recent news coverage, with five articles identified: three industry-related, one on development, and one on regulatory matters.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Apr 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Champion Creek Power, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 10053 Cattlemen 5 - 76030 Gasconades Creek
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.