Barrosos Creek Wind 4 (ERCOT-28INR0338) — Project Summary

Queue ID
ERCOT-28INR0338
Capacity
197.75 MW
Technology
Wind
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Cascabel Wind Energy, LLC
IA Status
Facility Study

Barrosos Creek Wind 4

ERCOT-28INR0338BetaActiveWindERCOTLBNL + Live

197.75 MW generation in Zapata, TX · In queue since August 2025 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

197.75 MW

Capacity

1

Components

Wind

1y 3m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 9m

Facilities Study50%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-31

Queue history
28INR0338 · 15 monthly ERCOT reports, Jul 2025 – Sep 2026

Projected COD moved

0 times

May 2028 → May 2028

Net change

0 months

first report to latest

Capacity

198 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 18, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 31, 2028
From queue filing
Developer in saved assessment
Cascabel Wind Energy, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedAug 2025

Entered ERCOT queue in Facility Study stage

COD targetMay 31, 2028Latest in this assessment

Proposed commercial operation date per ERCOT filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of May 2028. No independent news or research sources found to validate or contradict this date.

Developer: Only LBNL filing identifies Cascabel Wind Energy, LLC as developer. No news coverage or corporate announcements found to identify parent company or confirm operating entity.

Status: LBNL shows active status in Facility Study phase. No news coverage found to provide additional ground-truth on project progression or milestones.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Barrosos Creek Wind 4 project is a proposed 197.75 MW wind generation facility in Zapata County, Texas. Developed by Cascabel Wind Energy, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0338, with a queue entry date of August 18, 2025. The proposed commercial operation date is May 31, 2028, and the point of interconnection is #80227 Rapido 345 kV.

The project consists of wind turbine technology. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cascabel Wind Energy, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

#80227 Rapido 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.