18-ALPHA BESS
307.4 MW storage in Cooke, TX · In queue since April 2025 · Proposed COD February 2028
307.4 MW
Capacity
1
Components
Battery
1y 7m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-01
Projected COD moved
0 times
Feb 2028 → Feb 2028
Net change
0 months
first report to latest
Capacity
307 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/28INR0328/18-alpha-bess
- interconnection.fyi/project/ercot-28inr0328
- ercotqueue.com/developer/scout-energy-management-llc
- quicksandcheck.com/texas/cooke-county/
- app.nrgmap.com/queues/ercot-28inr0328
Commercial operation date: No news or press release gives a developer-backed COD. Cleanview repeats the queue date ('expected to come online in February 2028'), and quicksandcheck lists Sep 2028, a roughly 7-month difference that stays within the same year. I kept the LBNL date.
Developer: The LBNL filer 'Scout Energy Management, LLC' is also the name shown by ercotqueue.com and the quicksandcheck listing. No press release names a different parent, operating company or ownership change.
Status: LBNL, interconnection.fyi and NRG Map all show the project as active. Nothing indicates withdrawal, suspension or construction. One aggregator's 'Signed; security posted' note conflicts with the Facility Study / No IA status, so I did not rely on it.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The 18-ALPHA BESS project is a proposed 307.4 MW hybrid battery energy storage system located in Cooke County, Texas. Developed by SCOUT ENERGY MANAGEMENT, LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-28INR0328, with a queue entry date of April 21, 2025. The proposed commercial operation date is February 1, 2028, and the point of interconnection is to the 138 kV Valley View Substation.
The project is currently listed as active in the interconnection queue. Recent news coverage indicates industry interest in the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cooke
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
SCOUT ENERGY MANAGEMENT, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
To the 138 kV Valley View Substation, ( Bus No.691)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.