Outrider BESS (ERCOT-28INR0288) — Project Summary

Queue ID
ERCOT-28INR0288
Capacity
302 MW
Technology
Battery
Status
active
Location
Dickens, TX
Region
ERCOT
Developer
Sanders Hollow Energy Center, LLC
IA Status
Facility Study

Outrider BESS

ERCOT-28INR0288BetaActiveBatteryERCOTLBNL + Live

302 MW storage in Dickens, TX · In queue since June 2025 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

302 MW

Capacity

1

Components

Battery

1y 5m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryJun 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-26

Queue history
28INR0288 · 13 monthly ERCOT reports, Sep 2025 – Sep 2026

Projected COD moved

1 time

Sep 2028 → Jun 2029

Net change

+9 months

first report to latest

Capacity

302 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 5, 2025
Interconnection agreement signedJun 9, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 26, 2029
From queue filing
Developer in saved assessment
Sanders Hollow Energy Center, LLC
From queue filing
Status at research time
Active
Active — interconnection agreement and facility study still pending. Dickens County tax-abatement review for the project was underway in early 2026, with no action taken at the hearing reported.
Financing
Not recorded
Research sources and reasoning (8 recorded sources)

low confidence at research time

  1. ercotqueue.com/project/28INR0288
  2. ercotqueue.com/developer/sanders-hollow-energy-center-llc
  3. interconnection.fyi/projects/state/TX
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/28INR0288/outrider-bess
  5. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2506
  6. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  7. co.dickens.tx.us/upload/page/1662/Public%20Hearing%203.9.2026.pdf
  8. citizenportal.ai/articles/9683942/texas/dickens-county/commissioners-take-no-action-on-sanders-hollow-energy-center-tax-abatement

Commercial operation date: Only the LBNL/ERCOT queue date (2029-06-26) exists. Cleanview's "expected to come online in June 2029" appears to be copied from the queue, so it is not an independent developer-backed target.

Developer: ERCOT queue trackers and the PUC filing (Case 35077-2506) name Sanders Hollow Energy Center, LLC as the developer/interconnecting entity, and the county agreement names a project LLC, Outrider BESS, LLC. No source identifies a parent or operating company, so the shell-vs-parent question cannot be resolved.

Status: ercotqueue.com and interconnection.fyi both list the project as active with the IA and facility study pending. A 6/17/2026 PUC notice of cancellation of an ERCOT SGIA appears in the same docket, but the snippet does not say it concerns this project, so it does not change the status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Outrider BESS project is a proposed 302 MW hybrid battery energy storage project located in Dickens County, Texas. Developed by Sanders Hollow Energy Center, LLC, the project consists of battery storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0288, with a queue entry date of June 5, 2025.

The proposed commercial operation date for Outrider BESS is September 30, 2028. The point of interconnection (POI) is the Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT, approximately 11.13 miles from the Cottonwood Substation and 77.6 miles from the Edith Clarke Substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Dickens

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sanders Hollow Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT. Approximately distance from the POI to Cottonwood Substation is 11.13 miles and to Edith Clarke Substation 77.6 miles.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.