Wilson BESS (ERCOT-28INR0285) — Project Summary

Queue ID
ERCOT-28INR0285
Capacity
409.74 MW
Technology
Battery
Status
active
Location
Wilson, TX
Region
ERCOT
Developer
Dunamis BESS
IA Status
Facility Study

Wilson BESS

ERCOT-28INR0285BetaActiveBatteryERCOTLBNL

409.74 MW storage in Wilson, TX · In queue since April 2025 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

409.74 MW

Capacity

1

Components

Battery

1y 7m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-30

Queue history
28INR0285 · 10 monthly ERCOT reports, Apr 2025 – Jan 2026

Projected COD moved

0 times

Jun 2028 → Jun 2028

Net change

0 months

first report to latest

Capacity

410 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 21, 2025
CancelledFeb 13, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2028
From queue filing
Developer in saved assessment
Dunamis BESS
From queue filing
Status at research time
Withdrawn
LBNL snapshot shows Active (Facility Study), but the interconnection.fyi ERCOT listing shows Wilson BESS (28INR0285) as Withdrawn. This is a single undated aggregator snippet.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/market/ERCOT
  2. buzzsprout.com/1645528/episodes/18133043-ai-data-center-is-coming-to-wilson-county

Commercial operation date: Only the LBNL filing gives a COD (2028-06-30). No news or press release gives a developer target date. The project may also be withdrawn, in which case the date is moot.

Developer: The LBNL filing names Dunamis BESS and no source names a parent or operating company. A Nov 2025 podcast snippet mentions a developer with a 'Wilson BESS on 18 acres' project, but the snippet does not name the company or confirm it is Dunamis.

Status: interconnection.fyi, which mirrors the ERCOT GIS report, lists 28INR0285 as 'Withdrawn'. That conflicts with the LBNL 'active' status and is plausibly newer. It is the only signal, so confidence is low and the status should be verified against the current ERCOT GIS report.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Wilson BESS is a proposed battery energy storage development project located in Wilson County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Dunamis BESS and has a total proposed capacity of 409.74 megawatts (MW), consisting entirely of battery storage. It is designed to connect to the grid at a tap on the 345 kV Elm Creek (5133) to San Miguel (5901) transmission lines, Circuits 1 and 2.

The project entered the ERCOT interconnection queue on April 21, 2025, under queue identifier ERCOT-28INR0285, and its status is listed as active. As of the latest available data, its interconnection process is in the Facility Study phase. The developer has proposed a commercial operation date of June 30, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wilson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Dunamis BESS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 5133 Elm Creek - 5901 San Miguel CKT 1 & 2

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Elm Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.