Wilson BESS
409.74 MW storage in Wilson, TX · In queue since April 2025 · Proposed COD June 2028
409.74 MW
Capacity
1
Components
Battery
1y 7m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Projected COD moved
0 times
Jun 2028 → Jun 2028
Net change
0 months
first report to latest
Capacity
410 MW
unchanged in the reports
Latest stage
Cancelled
last listed Jan 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- interconnection.fyi/projects/market/ERCOT
- buzzsprout.com/1645528/episodes/18133043-ai-data-center-is-coming-to-wilson-county
Commercial operation date: Only the LBNL filing gives a COD (2028-06-30). No news or press release gives a developer target date. The project may also be withdrawn, in which case the date is moot.
Developer: The LBNL filing names Dunamis BESS and no source names a parent or operating company. A Nov 2025 podcast snippet mentions a developer with a 'Wilson BESS on 18 acres' project, but the snippet does not name the company or confirm it is Dunamis.
Status: interconnection.fyi, which mirrors the ERCOT GIS report, lists 28INR0285 as 'Withdrawn'. That conflicts with the LBNL 'active' status and is plausibly newer. It is the only signal, so confidence is low and the status should be verified against the current ERCOT GIS report.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Wilson BESS is a proposed battery energy storage development project located in Wilson County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Dunamis BESS and has a total proposed capacity of 409.74 megawatts (MW), consisting entirely of battery storage. It is designed to connect to the grid at a tap on the 345 kV Elm Creek (5133) to San Miguel (5901) transmission lines, Circuits 1 and 2.
The project entered the ERCOT interconnection queue on April 21, 2025, under queue identifier ERCOT-28INR0285, and its status is listed as active. As of the latest available data, its interconnection process is in the Facility Study phase. The developer has proposed a commercial operation date of June 30, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jan 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wilson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Dunamis BESS
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 5133 Elm Creek - 5901 San Miguel CKT 1 & 2
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Elm Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.