Dahlia Solar (ERCOT-28INR0240) — Project Summary

Queue ID
ERCOT-28INR0240
Capacity
200.98 MW
Technology
Solar
Status
suspended
Location
La Salle, TX
Region
ERCOT
Developer
Dahlia Energy LLC
IA Status
Facility Study

Dahlia Solar

ERCOT-28INR0240BetaSuspendedSolarERCOTLBNL + Live

200.98 MW generation in La Salle, TX · In queue since February 2025 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.98 MW

Capacity

1

Components

Solar

1y 9m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Suspended50%
Queue EntryFeb 14, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-02

Queue history
28INR0240 · 18 monthly ERCOT reports, Feb 2025 – Jul 2026

Projected COD moved

1 time

Jul 2028 → Jun 2029

Net change

+11 months

first report to latest

Capacity

201 MW

unchanged in the reports

Latest stage

Screening started

last listed Jul 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 14, 2025
On ERCOT's inactive listAug 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 30, 2029
Differs from queue: Jul 2, 2028From queue filing
Developer in saved assessment
Dahlia Energy LLC
From queue filing
Status at research time
Active
Active — early-stage Facility Study phase, queue entry February 2025
Financing
Not recorded

Milestones in this assessment

IA executedFeb 2025Latest in this assessment

Entered ERCOT interconnection queue, Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing identifies developer as Dahlia Energy LLC. No public corporate information, press releases, or news coverage found to identify a parent company or confirm this is an operating entity versus project SPV.

Status: LBNL status shows Active with Facility Study in progress. Queue date of February 2025 indicates very early-stage project with no public development activity yet announced.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Dahlia Solar is a proposed 200.98 MW solar photovoltaic generation project located in La Salle County, Texas. The development project is being pursued by Dahlia Energy LLC and is registered in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier ERCOT-28INR0240. The project consists of a single solar component and would connect to the grid at a point of interconnection on a tap of the 138 kV line between the Los Angeles (5723) and Fowlerton (5705) substations.

The project entered the ERCOT queue on February 14, 2025, and has a proposed commercial operation date of July 2, 2028. Its interconnection process has reached the Facility Study stage, but the project's queue status is currently listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Jul 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

La Salle

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Dahlia Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 5723 Los Angeles - 5705 Fowlerton

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Los Angeles Heights Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.