Tapaderos Storage (ERCOT-28INR0196) — Project Summary

Queue ID
ERCOT-28INR0196
Capacity
207 MW
Technology
Solar+Battery
Status
suspended
Location
Young, TX
Region
ERCOT
Developer
Tapaderos Storage, LLC
IA Status
Facility Study

Tapaderos Storage

ERCOT-28INR0196BetaSuspendedBatteryBatteryERCOTLBNL + Live

207 MW generation in Young, TX · In queue since November 2024 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207 MW

Capacity

1

Components

Battery

2 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Suspended50%
Queue EntryNov 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-19

Queue history
28INR0196 · 17 monthly ERCOT reports, Nov 2024 – Mar 2026

Projected COD moved

1 time

Jun 2028 → Sep 2028

Net change

+3 months

first report to latest

Capacity

207 → 207 MW

changed in the reports

Latest stage

Screening started

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 19, 2024
On ERCOT's inactive listApr 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 19, 2028
From queue filing
Developer in saved assessment
Tapaderos Storage, LLC
From queue filing
Status at research time
Active
Active — Facility Study phase, queue entry November 2024
Financing
Not recorded

Milestones in this assessment

IA executedNov 2024Latest in this assessment

Entered ERCOT queue and began Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of September 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity available. No press releases or corporate announcements found to identify a parent operating company. Entity name suggests project-specific LLC but no parent company identified.

Status: LBNL shows active status in Facility Study phase. No news coverage found to indicate construction activity, financing, or status changes.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tapaderos Storage (ERCOT queue ID 28INR0196) is a proposed 207 MW energy storage development project in Young County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Tapaderos Storage, LLC. Although the queue classifies it under the Solar+Battery technology category, its only listed component is a 207 MW battery storage system, and no solar capacity is specified. The project would connect to the grid at a tap on the 345 kV transmission line between the Graham SES (#1430) and Long Creek (#1435) substations.

The project entered the ERCOT interconnection queue on November 19, 2024, and has a proposed commercial operation date of September 19, 2028. Its interconnection agreement status is listed as Facility Study, but the project's overall queue status is currently suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Young

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tapaderos Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

TAP 345kV #1430 GRAHAM SES - #1435 LONG CREEK

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.