RAYBURN ENERGY STATION II Gas (TEF-Due Diligence) (ERCOT-28INR0108) — Project Summary

Queue ID
ERCOT-28INR0108
Capacity
570 MW
Technology
Gas
Status
active
Location
Grayson, TX
Region
ERCOT
Developer
Rayburn Energy Station LLC
IA Status
Facility Study

RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)

ERCOT-28INR0108BetaActiveGasERCOTLBNL + Live

570 MW generation in Grayson, TX · In queue since January 2025 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

570 MW

Capacity

1

Components

Gas

1y 10m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 1m

Facilities Study50%
Queue EntryJan 13, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-26

Queue history
28INR0108 · 21 monthly ERCOT reports, Jan 2025 – Sep 2026

Projected COD moved

0 times

Feb 2028 → Feb 2028

Net change

0 months

first report to latest

Capacity

570 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 13, 2025
Facilities study approvedJan 15, 2026
Interconnection agreement signedDec 22, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 2028
Differs from queue: Feb 26, 2028
Developer in saved assessment
Rayburn Electric Cooperative
Filed as Rayburn Energy Station LLC
Status at research time
Active
Active in the ERCOT queue (Facility Study). Texas Energy Fund loan agreement executed June 2026, so the project is moving toward construction for a June 2028 online date.
Financing
Secured
Texas Energy Fund loan agreement with the PUCT executed June 4, 2026. Dallas Express reports a $411M loan approved by Gov. Abbott.

Milestones in this assessment

Financing closeJun 4, 2026

Rayburn Electric executed a TEF loan agreement with the PUCT to finance the 570 MW RES II.

rayburnelectric.com
COD targetJun 2028Latest in this assessment

RES II is scheduled to come online in June 2028.

rayburnelectric.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. rayburnelectric.com/news-releases/rayburn-electric-cooperative-executes-texas-energy-fund-loan-agreement-for-rayburn-energy-station-ii/
  2. rayburnelectric.com/news-releases_category/rayburn-energy-station-2/
  3. dallasexpress.com/metroplex/first-electric-co-op-wins-411m-texas-energy-fund-loan-for-sherman-power-plant/
  4. interconnection.fyi/project/ercot-28inr0108
  5. ercotqueue.com/project/28INR0108

Commercial operation date: Rayburn Electric's June 4, 2026 press release says RES II "is scheduled to come online in June 2028," versus the LBNL proposed COD of 2028-02-26. The gap is only about 4 months, so the sources agree to within a year.

Developer: The LBNL filing entity is Rayburn Energy Station LLC, the project-level entity. The press release names Rayburn Electric Cooperative as the owner and operator ("locally owned and operated"), and aggregator sites list Rayburn Country Electric Cooperative, Inc.

Status: LBNL shows active, and the June 2026 TEF loan execution confirms the project is advancing. No source shows it under construction yet or operational. The interxdata 'operational' label looks erroneous.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Rayburn Energy Station II Gas (TEF-Due Diligence) project is a proposed 570 MW gas-fired generation project located in Grayson County, Texas. The developer is Rayburn Energy Station LLC. This project is in the ERCOT interconnection queue as entry ERCOT-28INR0108, with a queue entry date of January 13, 2025, and a proposed commercial operation date of February 26, 2028. An Interconnection Agreement (IA) was executed on December 22, 2025.

The proposed project is linked to the existing Rayburn Energy Station LLC operating plant (EIA ID 58005).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Grayson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rayburn Energy Station LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Double Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Haggerty - Winding Oaks Switch

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.