Varadero Solar
206 MW generation in Limestone, TX · In queue since July 2023 · Proposed COD April 2029
206 MW
Capacity
1
Components
Solar
3y 4m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-01
Projected COD moved
1 time
Apr 2028 → Apr 2029
Net change
+12 months
first report to latest
Capacity
305 → 206 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Standard Generator Interconnection Agreement filed with Texas PUC between Lone Star Transmission and NextEra for Varadero Solar
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/28INR0013/varadero-solar
- ercotqueue.com/project/28INR0013
- interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2412
- ercot.com/files/docs/2026/04/07/Capacity-Changes-by-Fuel-Type-Charts_March_2026.xlsx
- opensource.gridstatus.io/en/0.23.0/interconnection_queues.html
Commercial operation date: LBNL queue snapshot shows proposed COD of 2029-04-01. ERCOT capacity chart (March 2026) confirms 2029 target. No contradictory news or press releases found.
Developer: LBNL filing entity is 'NextEra Energy Interconnection Holdings, LLC' (project-specific shell). Texas PUC filings reference 'NextEra Energy Resources Interconnection Holdings, LLC' as the actual operating entity, which is NextEra Energy Resources' interconnection subsidiary.
Status: LBNL shows 'active' status with 'Facility Study' IA status. Texas PUC Interchange confirms Standard Generator Interconnection Agreement filing between Lone Star Transmission and NextEra on March 2, 2026, indicating active progression through interconnection process.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed Varadero Solar project is a 304.74 MW solar generation facility located in Limestone County, Texas. It is being developed by NextEra Energy Interconnection Holdings, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0013, with a queue entry date of July 10, 2023.
The proposed commercial operation date for Varadero Solar is April 1, 2029. Its interconnection status is currently in the Facility Study phase. The point of interconnection is #68092 Liberty Station 345kV.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Limestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NextEra Energy Interconnection Holdings, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#68092 Liberty Station 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Varadero Solar
Data-driven briefing on Varadero Solar — fleet, generation, financial, and news signals.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.