Redbird BESS (ERCOT-27INR0627) — Project Summary

Queue ID
ERCOT-27INR0627
Capacity
100 MW
Technology
Battery
Status
active
Location
Fort Bend, TX
Region
ERCOT
Developer
Redbird BESS, LLC
IA Status
—

Redbird BESS

ERCOT-27INR0627BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

100 MW hybrid in Fort Bend, TX · In queue since May 2026 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100 MW

Capacity

0

Components

5 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 10m

Pre-Study0%
Queue EntryMay 13, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-01

About

Redbird BESS (queue ID ERCOT-27INR0627) is a proposed battery energy storage development project in Fort Bend County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Redbird BESS, LLC and has a total proposed capacity of 100 MW. It is classified as a hybrid project, and its listed technology components are battery energy storage and an additional component categorized as "Other." The data does not give capacities for the individual components. The project would interconnect at the Cedar Creek 345 kV point of interconnection (44090 Cedar Creek 345kV).

The project entered the ERCOT interconnection queue on May 13, 2026, and its status is active. Its proposed commercial operation date is March 1, 2029. The available data does not report the status of an interconnection agreement. The project is not linked to an existing operating plant in EIA records, and it has no recorded news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Fort Bend

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Redbird BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44090 Cedar Creek 345kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BCK_RN
POI Substation
Cedar Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Redbird BESS
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.