Trailblazer Natural Gas Generation Plant
1,026 MW generation in Nolan, TX · In queue since May 2026 · Proposed COD December 2027
1,026 MW
Capacity
0
Components
5 months
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-12
The Trailblazer Natural Gas Generation Plant is a proposed natural gas development project in Nolan County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Trailblazer Infrastructure LLC is the developer. The project would have a total capacity of 1,026 MW, generated by combustion (gas) turbine technology. It is designed to connect to the grid at the Sweetwater East Switch 345 kV substation (point of interconnection 11420).
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-27INR0575, with a queue entry date of May 11, 2026. Its interconnection request is currently active. The proposed commercial operation date is December 12, 2027. The available data does not report the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Nolan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Trailblazer Infrastructure LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
11420 Sweetwater East Switch 345 kV
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TRENT_TRENT
- POI Substation
- Sweetwater East Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Trailblazer Natural Gas Generation PlantForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.