Paolo Sole Hamilton Solar (ERCOT-27INR0516) — Project Summary

Queue ID
ERCOT-27INR0516
Capacity
40.63 MW
Technology
Solar
Status
suspended
Location
Hamilton, TX
Region
ERCOT
Developer
Viridian Power Development, LLC
IA Status
Facility Study

Paolo Sole Hamilton Solar

ERCOT-27INR0516BetaSuspendedSolarERCOTLBNL + Live

40.63 MW generation in Hamilton, TX · In queue since May 2025 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

40.63 MW

Capacity

1

Components

Solar

1y 6m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 2m

Suspended50%
Queue EntryMay 27, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-11

Queue history
27INR0516 · 13 monthly ERCOT reports, May 2025 – May 2026

Projected COD moved

1 time

Jun 2027 → Jul 2028

Net change

+13 months

first report to latest

Capacity

41 MW

unchanged in the reports

Latest stage

Screening started

last listed May 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 27, 2025
On ERCOT's inactive listJun 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Paolo Sole Hamilton Solar is a proposed 40.63 MW solar generation project located in Hamilton County, Texas. The development project is being advanced by Viridian Power Development, LLC, and consists of a single solar component with a capacity of 40.63 MW. The project is planned to connect to the grid at the #258 Hamilton 69 kV point of interconnection.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-27INR0516, with a queue entry date of May 27, 2025. Its proposed commercial operation date is July 11, 2028. Within the interconnection process, the project has reached the Facility Study stage. However, its current queue status is listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: May 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hamilton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Viridian Power Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

#258 Hamilton 69 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.