Antila Solar
500 MW generation in Borden, TX · In queue since April 2025 · Proposed COD November 2027
500 MW
Capacity
1
Components
Solar
1y 7m
In Queue
IA Executed
IA Phase
Signed Aug 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4 months
IA → COD
2y 3m
Total Duration
4 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2027-11-30
Projected COD moved
0 times
Nov 2027 → Nov 2027
Net change
0 months
first report to latest
Capacity
500 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Generation Interconnection Agreement between Wind Energy Transmission Texas, LLC and SE DC DevCo, LLC for the Antila Solar Project, filed with the Texas PUC in Aug 2025. The execution date is from LBNL.
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
low confidence at research time
- interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2227
- interconnection.fyi/project/ercot-27inr0500
- ercotqueue.com/project/27INR0500
- cleanview.co/power-projects/planned/solar-farms/texas/27INR0500/antila-solar
- interxdata.com/projects/antila-solar-ercot-gis-report-27inr0500/
Commercial operation date: The only COD signal is the LBNL/ERCOT proposed date of 2027-11-30. Aggregators (interconnection.fyi: 'proposed completion date is November 30, 2027'; Cleanview: 'Expected online 2027') appear to mirror queue data rather than give an independent developer or financing-backed target.
Developer: Every queue-derived source lists Antila Solar LLC. The Texas PUC filing names 'SE DC DevCo, LLC' as the interconnection agreement counterparty for the Antila Solar Project. No source identifies an operating parent for either entity, so I did not assert a shell-vs-parent relationship.
Status: LBNL shows ia_status 'IA Executed' (2025-08-13) with active queue status, and an Aug 2025 PUC filing of the Generation Interconnection Agreement corroborates this. One aggregator (interxdata) labels the project 'operational', which conflicts with LBNL's is_operational=false and the lack of any construction news, so I discounted it. ercotqueue.com's 'IA, FIS pending' note is ambiguous.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Antila Solar is a proposed 500 MW solar generation project located in Borden County, Texas. Developed by Antila Solar LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-27INR0500. The project entered the interconnection queue on April 21, 2025, and has a proposed commercial operation date of November 30, 2027.
The project's Interconnection Agreement (IA) date is August 13, 2025. The point of interconnection (POI) is #59916 Buck Canyon 345kV. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Borden
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Antila Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#59916 Buck Canyon 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.