Power Lane II Gas (ERCOT-27INR0489) — Project Summary

Queue ID
ERCOT-27INR0489
Capacity
104.39 MW
Technology
Gas
Status
active
Location
Hunt, TX
Region
ERCOT
Developer
GEUS
IA Status
Facility Study

Power Lane II Gas

ERCOT-27INR0489BetaActiveGasERCOTLBNL + Live

104.39 MW generation in Hunt, TX · In queue since June 2025 · Proposed COD June 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

104.39 MW

Capacity

1

Components

Gas

1y 5m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 years

Facilities Study50%
Queue EntryJun 3, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

Queue history
27INR0489 · 17 monthly ERCOT reports, May 2025 – Sep 2026

Projected COD moved

0 times

Jun 2027 → Jun 2027

Net change

0 months

first report to latest

Capacity

104 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 3, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 1, 2027
From queue filing
Developer in saved assessment
Greenville Electric Utility System
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue, no construction timeline publicly announced
Financing
Not recorded

Milestones in this assessment

IA executedJun 2025Latest in this assessment

Entered ERCOT interconnection queue in Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2027. No independent news or press releases found to validate or contradict this date.

Developer: GEUS is the municipal utility serving Greenville, Texas (Hunt County). No shell LLC structure evident; GEUS appears to be the direct filing entity and operator.

Status: LBNL shows active status in Facility Study phase as of June 2025 queue entry. No public announcements or news coverage found regarding project progress.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Power Lane II Gas is a proposed 104.39 MW gas-fired generation project located in Hunt County, Texas. The project, utilizing internal combustion technology, is being developed by GEUS. It is listed in the ERCOT interconnection queue as entry ERCOT-27INR0489, with a queue entry date of June 3, 2025, and a proposed commercial operation date of June 1, 2027.

The project is currently listed as active in the ERCOT queue. It has been the subject of recent news coverage, with 14 articles related to the industry, grid, regulatory, and development aspects of the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hunt

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

GEUS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles

No Ask reports yet for this entity.

Ask about Power Lane II Gas
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.