Moccasin Storage (ERCOT-27INR0452) — Project Summary

Queue ID
ERCOT-27INR0452
Capacity
603.08 MW
Technology
Solar+Battery
Status
active
Location
Jones, TX
Region
ERCOT
Developer
ENGIE IR Holdings LLC
IA Status
Facility Study

Moccasin Storage

ERCOT-27INR0452BetaActiveBatteryBatteryERCOTLBNL + Live

603.08 MW generation in Jones, TX · In queue since January 2025 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

603.08 MW

Capacity

1

Components

Battery

1y 10m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 6m

Facilities Study50%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

Queue history
27INR0452 · 21 monthly ERCOT reports, Jan 2025 – Sep 2026

Projected COD moved

1 time

Dec 2027 → Jul 2028

Net change

+7 months

first report to latest

Capacity

603 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 28, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 1, 2028
From queue filing
Developer in saved assessment
ENGIE
Filed as ENGIE IR Holdings LLC
Status at research time
Active
Active in ERCOT queue — Facility Study stage, no executed IA; ercotqueue.com shows 'No IA' and 'build-chance 1%'; no construction or financing announced
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/27INR0452/moccasin-storage
  2. ercotqueue.com/project/27INR0452
  3. ercotqueue.com/developer/engie
  4. substationscout.com/ercot/project/27inr0452-moccasin-storage/
  5. interconnection.fyi/projects/state/TX/jones-county

Commercial operation date: Only the LBNL proposed COD of 2028-07-01 exists. Cleanview's 'expected to come online in July 2028' matches it but appears to be derived from the same queue data, so it is not an independent developer-backed signal.

Developer: The LBNL filing entity is ENGIE IR Holdings LLC. ercotqueue.com aggregates it under the ENGIE developer, so the parent is ENGIE. No press release or developer announcement confirms this.

Status: LBNL status is active, and aggregators (interconnection.fyi, substationscout) agree: SS completed, FIS started, no IA. There is no evidence of construction or withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Moccasin Storage project is a proposed 603.08 MW hybrid development project located in Jones County, Texas. The project, developed by ENGIE IR Holdings LLC, consists of battery energy storage and another unspecified technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0452, with a queue entry date of January 28, 2025, and a proposed commercial operation date of July 1, 2028.

The point of interconnection (POI) for Moccasin Storage is Tap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-2.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Jones

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ENGIE IR Holdings LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.