Gulf Prairie Solar (ERCOT-27INR0449) — Project Summary

Queue ID
ERCOT-27INR0449
Capacity
202.17 MW
Technology
Solar+Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Gulf Prairie Energy LLC
IA Status
Facility Study

Gulf Prairie Solar

ERCOT-27INR0449BetaActiveSolarBatteryERCOTLBNL + Live

202.17 MW hybrid in Brazoria, TX · In queue since June 2025 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

202.17 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 6m

Facilities Study50%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Queue history
27INR0449 · 17 monthly ERCOT reports, May 2025 – Sep 2026

Projected COD moved

1 time

Mar 2027 → Dec 2028

Net change

+21 months

first report to latest

Capacity

202 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 19, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2028
From queue filing
Developer in saved assessment
Gulf Prairie Energy LLC
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue as of June 2025, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedJun 19, 2025

Entered ERCOT interconnection queue, Facility Study phase

COD targetDec 2028Latest in this assessment

Proposed commercial operation date per LBNL queue filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Gulf Prairie Energy LLC is the filing entity in LBNL queue. No news coverage found to identify if this is a project-specific LLC or an operating parent company, nor any ownership structure details.

Status: LBNL status shows Active with Facility Study underway. No news coverage found to indicate construction start, financing close, or any status changes.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Gulf Prairie Solar project is a proposed 202.17 MW solar generation facility in Brazoria County, Texas. Developed by Gulf Prairie Energy LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0449, with a queue entry date of June 19, 2025. The proposed commercial operation date is December 1, 2028.

The point of interconnection (POI) is specified as a loop on either the 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110) substations, or on the 345 kV circuit 18 between DOW (#42500) and Huizache (#46640) substations.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gulf Prairie Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.