Resaca Oasis Storage (ERCOT-27INR0399) — Project Summary

Queue ID
ERCOT-27INR0399
Capacity
200.7 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Resaca Oasis Storage, LLC
IA Status
IA Executed

Resaca Oasis Storage

ERCOT-27INR0399BetaActiveBatteryERCOTLBNL + Live

200.7 MW storage in Cameron, TX · In queue since December 2024 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.7 MW

Capacity

1

Components

Battery

1y 11m

In Queue

IA Executed

IA Phase

Signed May 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

5 months

IA → COD

3y 4m

Total Duration

5 months

Construction75%
Queue EntryDec 12, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 22, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-09-20

Queue history
27INR0399 · 22 monthly ERCOT reports, Dec 2024 – Sep 2026

Projected COD moved

1 time

Sep 2027 → Sep 2028

Net change

+12 months

first report to latest

Capacity

201 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 12, 2024
Facilities study approvedOct 10, 2025
Interconnection agreement signedMay 22, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Sep 20, 2027
Differs from queue: Sep 20, 2028From queue filing
Developer in saved assessment
Resaca Oasis Storage, LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed May 2025, project in pre-construction phase targeting Q3 2027 operation
Financing
Not recorded

Milestones in this assessment

IA executedMay 22, 2025

Interconnection Agreement executed with ERCOT

lbnl_queue_snapshot
COD targetSep 20, 2027Latest in this assessment

Proposed commercial operation date per ERCOT queue

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: LBNL queue snapshot provides September 2027 COD target. No independent news or press releases found to validate or contradict this date.

Developer: Only LBNL filing entity available. No press releases or corporate announcements found to identify parent company or operating entity behind the project LLC.

Status: LBNL shows IA executed in May 2025 with active status. No news coverage found to provide additional ground-truth on construction timeline or permitting progress.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Resaca Oasis Storage project is a proposed 200.7 MW battery energy storage system located in Cameron County, Texas. The project, developed by Resaca Oasis Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0399, with a queue entry date of December 12, 2024. The proposed commercial operation date is September 20, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the project is the # 79601 Stillman Substation 138 kV. The development has appeared in recent news coverage regarding energy storage projects in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Resaca Oasis Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

# 79601 Stillman Substation 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
POI Substation
Palmito Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.