Tomahawk Road BESS (ERCOT-27INR0341) — Project Summary

Queue ID
ERCOT-27INR0341
Capacity
205 MW
Technology
Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Horizon Energy Storage Greenfield Project Holdings LLC
IA Status
Facility Study

Tomahawk Road BESS

ERCOT-27INR0341BetaActiveBatteryERCOTLBNL

205 MW storage in Ector, TX · In queue since August 2024 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205 MW

Capacity

1

Components

Battery

2y 3m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

Queue history
27INR0341 · 20 monthly ERCOT reports, Aug 2024 – Mar 2026

Projected COD moved

1 time

May 2027 → Mar 2028

Net change

+10 months

first report to latest

Capacity

251 → 205 MW

changed in the reports

Latest stage

Cancelled

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 16, 2024
CancelledApr 13, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 1, 2028
From queue filing
Developer in saved assessment
Horizon Energy Storage Greenfield Project Holdings LLC
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedAug 2024Latest in this assessment

Entered ERCOT interconnection queue at Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of March 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity available. No press releases or news coverage found to identify if this is a shell LLC or the actual operating company. Name structure suggests it may be a project-specific entity.

Status: LBNL status shows Active with Facility Study in progress. No news coverage found to provide additional ground-truth status updates.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Tomahawk Road BESS is a proposed energy storage project located in Ector County, Texas, with a total capacity of 257.25 MW. The project, developed by Horizon Energy Storage Greenfield Project Holdings LLC, consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0341, with a queue entry date of August 16, 2024.

The proposed commercial operation date for the Tomahawk Road BESS is March 1, 2028. Its interconnection point is Tap 138 kV 1019 Moss - 1113 Odessa Southwest. The project's interconnection status is currently in the Facility Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Horizon Energy Storage Greenfield Project Holdings LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV 1019 Moss - 1113 Odessa Southwest

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Moss Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.