Rock Island Generating (TEF -Due Diligence) (ERCOT-27INR0321) — Project Summary

Queue ID
ERCOT-27INR0321
Capacity
121.8 MW
Technology
Gas
Status
active
Location
Colorado, TX
Region
ERCOT
Developer
Kerrville Public Utility Board Public Facility Corporation
IA Status
IA Executed

Rock Island Generating (TEF -Due Diligence)

ERCOT-27INR0321BetaActiveGasERCOTLBNL + Live

121.8 MW generation in Colorado, TX · In queue since July 2024 · Proposed COD June 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

121.8 MW

Capacity

1

Components

Gas

2y 4m

In Queue

IA Executed

IA Phase

Signed Mar 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

8 months

IA → COD

2y 3m

Total Duration

8 months

Construction75%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 17, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2027-06-01

Queue history
27INR0321 · 27 monthly ERCOT reports, Jul 2024 – Sep 2026

Projected COD moved

0 times

Jun 2027 → Jun 2027

Net change

0 months

first report to latest

Capacity

122 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 22, 2024
Facilities study approvedMar 21, 2025
Interconnection agreement signedMar 17, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 1, 2027
From queue filing
Developer in saved assessment
Kerrville Public Utility Board
Filed as Kerrville Public Utility Board Public Facility Corporation
Status at research time
IA Executed
IA Executed — interconnection agreement signed March 2025, project active in queue with 2027 target COD
Financing
Not recorded

Milestones in this assessment

IA executedMar 17, 2025

Interconnection Agreement executed with ERCOT

lbnl_queue_snapshot
COD targetJun 1, 2027Latest in this assessment

Proposed commercial operation date for 121.8 MW gas facility

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available with proposed COD of June 2027. No independent news or press releases found to validate or contradict this date.

Developer: LBNL filing entity is 'Public Facility Corporation' which is a special-purpose financing vehicle. The operating entity is Kerrville Public Utility Board, a municipal utility serving Kerrville, TX.

Status: LBNL shows IA executed on 2025-03-17 with active queue status. This is a recent milestone indicating the project has cleared a major regulatory hurdle.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Rock Island Generating (TEF -Due Diligence) project is a proposed 121.8 MW gas-fired generation facility in Colorado County, Texas. The project, developed by Kerrville Public Utility Board Public Facility Corporation, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0321, with a queue entry date of July 22, 2024. The proposed commercial operation date is June 1, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 57640 Rock Island 138 kV line. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Colorado

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Kerrville Public Utility Board Public Facility Corporation

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

57640 Rock Island 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SKY1
POI Substation
Rock Island Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.