Old Roman Energy Center (ERCOT-27INR0315) — Project Summary

Queue ID
ERCOT-27INR0315
Capacity
207.34 MW
Technology
Battery
Status
active
Location
Reagan, TX
Region
ERCOT
Developer
Nova Clean Energy LLC
IA Status
Facility Study

Old Roman Energy Center

ERCOT-27INR0315BetaActiveBatteryERCOTLBNL + Live

207.34 MW storage in Reagan, TX · In queue since October 2024 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207.34 MW

Capacity

1

Components

Battery

2y 1m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Facilities Study50%
Queue EntryOct 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-26

Queue history
27INR0315 · 25 monthly ERCOT reports, Sep 2024 – Sep 2026

Projected COD moved

2 times

Jun 2027 → Jul 2029

Net change

+25 months

first report to latest

Capacity

204 → 207 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 1, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Aug 31, 2027
Differs from queue: Jul 26, 2029From queue filing
Developer in saved assessment
Nova Clean Energy
From queue filing
Status at research time
Active
Active — Facility Study phase in ERCOT queue, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 2024Latest in this assessment

Entered ERCOT queue and began Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of August 2027. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL filing entity is 'Nova Clean Energy LLC'. No news coverage found to confirm parent company structure or identify if this is a project SPV versus operating entity name.

Status: LBNL status shows 'active' with Facility Study in progress. No news coverage found to provide ground-truth updates on permitting, financing, or construction milestones.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Old Roman Energy Center is a proposed 207.34 MW battery storage project located in Reagan County, Texas. Developed by Nova Clean Energy LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0315, with a queue entry date of October 1, 2024, and a proposed commercial operation date of August 31, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Reagan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Nova Clean Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

23868 STILES 138 KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Stiles Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.