Tall Saddle Wind (ERCOT-27INR0310) — Project Summary

Queue ID
ERCOT-27INR0310
Capacity
522.8 MW
Technology
Wind
Status
active
Location
Kenedy, TX
Region
ERCOT
Developer
Tall Saddle Wind, LLC
IA Status
Facility Study

Tall Saddle Wind

ERCOT-27INR0310BetaActiveWindERCOTLBNL + Live

522.8 MW generation in Kenedy, TX · In queue since July 2024 · Proposed COD October 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

522.8 MW

Capacity

1

Components

Wind

2y 4m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryJul 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-15

Queue history
27INR0310 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

0 times

Oct 2029 → Oct 2029

Net change

0 months

first report to latest

Capacity

523 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 1, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 15, 2029
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no executed IA (ercotqueue.com shows 'No IA', 12% build-chance); no construction or financing announced.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-27inr0310
  2. ercotqueue.com/project/27INR0310
  3. ercotqueue.com/developer/tall-saddle-wind-llc
  4. cleanview.co/power-projects/planned/wind-farms/texas/27INR0310/tall-saddle-wind
  5. bizapedia.com/tx/tall-saddle-wind-llc.html

Commercial operation date: No news or press release signal gives a different date. Aggregators (interconnection.fyi, cleanview) only mirror the LBNL/ERCOT proposed COD of October 15, 2029 and are not independent confirmation.

Developer: Only the project-LLC name appears (LBNL, ercotqueue.com, interconnection.fyi, Bizapedia). No parent or operating company is identified in any source.

Status: LBNL and ERCOT-tracking aggregators agree the project is active and not operational. The interxdata 'operational' label conflicts with the queue data and is treated as an aggregator error.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tall Saddle Wind is a proposed 522.8 MW wind generation project located in Kenedy County, Texas. The development project is being pursued by Tall Saddle Wind, LLC and consists of a single wind component totaling 522.8 MW. The project is planned to connect to the grid at the Ajo Substation 345 kV (bus 80076), which serves as its proposed point of interconnection.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier ERCOT-27INR0310. It entered the queue on July 1, 2024, and its status remains active. As of the most recent data, the project is in the Facility Study phase of the interconnection process. Its proposed commercial operation date is October 15, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kenedy

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tall Saddle Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

80076 AJO SUBSTATION 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Ajo Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.