Kurtz Solar SLF (ERCOT-27INR0305) — Project Summary

Queue ID
ERCOT-27INR0305
Capacity
101.9 MW
Technology
Solar+Battery
Status
active
Location
Atascosa, TX
Region
ERCOT
Developer
Kurtz Solar, LLC
IA Status
Facility Study

Kurtz Solar SLF

ERCOT-27INR0305BetaActiveSolarBatteryERCOTLBNL + Live

101.9 MW hybrid in Atascosa, TX · In queue since September 2024 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.9 MW

Capacity

1

Components

Solar

1y 10m

In Queue

Facility Study

IA Phase

COD target: 2029

Interconnection

Total Duration

4y 8m

Facilities Study50%
Queue EntrySep 4, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-31

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2029-05-31
From queue filing
Developer
Kurtz Solar, LLC
From queue filing
Status
Active
Active — Facility Study phase as of September 2024 queue entry
Financing
Unannounced
Key milestones
IA executedSep 4, 2024Most recent

Entered ERCOT interconnection queue in Facility Study phase

About

Kurtz Solar SLF is a proposed solar generation project located in Atascosa County, Texas, with a total capacity of 101.9 MW. Developed by Kurtz Solar, LLC, the project consists of 101.9 MW of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0305, with a queue entry date of September 4, 2024.

The proposed commercial operation date for Kurtz Solar SLF is May 31, 2029. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 69kV #8206 Charlotte - #8607 Jourdanton.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Atascosa

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Kurtz Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 69kV #8206 Charlotte - #8607 Jourdanton

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Kurtz Solar SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.