Tolivar Power Plant (TEF- Due Diligence) (ERCOT-27INR0297) — Project Summary

Queue ID
ERCOT-27INR0297
Capacity
224.5 MW
Technology
Gas
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
Pecos Power Plant, LLC
IA Status
IA Executed

Tolivar Power Plant (TEF- Due Diligence)

ERCOT-27INR0297BetaActiveGasERCOTLBNL + Live

224.5 MW generation in Reeves, TX · In queue since July 2024 · Proposed COD June 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

224.5 MW

Capacity

1

Components

Gas

2y 4m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1 year

IA → COD

1y 11m

Total Duration

1 year

Construction75%
Queue EntryJul 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 1, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2027-06-11

Queue history
27INR0297 · 28 monthly ERCOT reports, Jun 2024 – Sep 2026

Projected COD moved

2 times

Apr 2027 → Jun 2027

Net change

+2 months

first report to latest

Capacity

226 → 225 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 1, 2024
Facilities study approvedJun 23, 2025
Interconnection agreement signedJul 1, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
May 6, 2027
Differs from queue: Jun 11, 2027From queue filing
Developer in saved assessment
Pecos Power Plant, LLC
From queue filing
Status at research time
Active
Active — IA executed July 2025, 224.5 MW gas project in Reeves County targeting May 2027 COD
Financing
Not recorded

Milestones in this assessment

IA executedJul 1, 2025

Interconnection Agreement executed with ERCOT

lbnl_queue_snapshot
COD targetMay 6, 2027Latest in this assessment

Proposed commercial operation date per interconnection filing

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available with proposed COD of May 2027. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Pecos Power Plant, LLC' is available. No news coverage found to identify parent company or operating entity behind this project-specific LLC.

Status: LBNL shows 'active' status with IA executed as of July 2025, indicating project has secured interconnection agreement and remains in queue.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Tolivar Power Plant (TEF- Due Diligence) is a proposed project located in Reeves County, Texas, within the ERCOT region. Developed by Pecos Power Plant, LLC, the project consists of 225.6 MW of gas-fired generation. It entered the ERCOT interconnection queue as project ERCOT-27INR0297 on July 1, 2024, with a proposed commercial operation date of May 6, 2027.

The project's Interconnection Agreement (IA) has been executed as of November 12, 2024. The point of interconnection (POI) is Tap 138 KV 38045 IH20-38043 COWPEN.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pecos Power Plant, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 KV 38045 IH20-38043 COWPEN

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Tolivar Power Plant (TEF- Due Diligence)
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.