Raghorn Storage SLF
— hybrid in Jim Wells, TX · In queue since May 2024 · Proposed COD May 2028
—
Capacity
0
Components
2y 5m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-31
Raghorn Storage SLF is a proposed battery energy storage development project in Jim Wells County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Raghorn Storage LLC and is classified as a hybrid project, with its technology components listed as battery energy storage and an additional component categorized as "Other." Capacity figures for the project and its individual components are not specified in the available queue data.
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-27INR0259 and holds active status. It entered the queue on May 20, 2024, and has a proposed commercial operation date of May 31, 2028. The planned point of interconnection is a tap on the 69 kV line between substation #5654 San Diego and substation #5658 Orange Grove. Information on the status of an interconnection agreement is not included in the available data.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jim Wells
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Raghorn Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69kV #5654 San Diego - #5658 Orange Grove
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Raghorn Storage SLFForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.