Sun Angel ESS (ERCOT-27INR0247) — Project Summary

Queue ID
ERCOT-27INR0247
Capacity
201.54 MW
Technology
Battery
Status
active
Location
Angelina, TX
Region
ERCOT
Developer
Sun Angel ESS LLC
IA Status
Facility Study

Sun Angel ESS

ERCOT-27INR0247BetaActiveBatteryERCOTLBNL + Live

201.54 MW storage in Angelina, TX · In queue since June 2024 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.54 MW

Capacity

1

Components

Battery

2y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryJun 13, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-21

Queue history
27INR0247 · 28 monthly ERCOT reports, Jun 2024 – Sep 2026

Projected COD moved

2 times

Jul 2027 → Sep 2028

Net change

+14 months

first report to latest

Capacity

201 → 202 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 13, 2024
Facilities study approvedSep 1, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jul 1, 2028
Differs from queue: Sep 21, 2028From queue filing
Developer in saved assessment
Sun Angel ESS LLC
From queue filing
Status at research time
Active
Active — Facility Study stage as of June 2024 queue entry, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedJun 2024Latest in this assessment

Entered ERCOT queue at Facility Study stage

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of July 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Sun Angel ESS LLC' is available. No news coverage or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell entity.

Status: LBNL status shows Active with Facility Study in progress. No contradicting information or advancement signals found in public sources.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Sun Angel ESS project is a proposed 201.54 MW battery storage project located in Angelina County, Texas. Developed by Sun Angel ESS LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0247, with a queue entry date of June 13, 2024, and a proposed commercial operation date of July 1, 2028. The project's interconnection agreement status is currently in the Facility Study phase.

The proposed project is linked to the existing Sun Angel ESS operating plant (EIA ID 68362). The point of interconnection is Tap 138kV LUFKINE East (#3326) - HERTY TAP (#3318). The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Angelina

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sun Angel ESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV LUFKINE East (#3326) - HERTY TAP (#3318)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
POI Substation
Champion Paper Mill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Sun Angel ESS
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.