Ochoa Energy Storage II
516.56 MW storage in Waller, TX · In queue since April 2024 · Proposed COD January 2029
516.56 MW
Capacity
1
Components
Battery
2y 7m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-01
Projected COD moved
2 times
Jun 2026 → Jan 2029
Net change
+31 months
first report to latest
Capacity
502 → 517 MW
changed in the reports
Latest stage
Cancelled
last listed Jun 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-27inr0235
- interconnection.fyi/projects/state/TX
- cleanview.co/power-projects/planned/battery-storage-projects/texas/27INR0235/ochoa-energy-storage-ii
- ercotqueue.com/developer/ochoa-energy-storage-ii-llc
Commercial operation date: Only the LBNL proposed COD of 2029-01-01 exists. The Cleanview aggregator also lists 'Expected online 2029', but it appears to be derived from the same queue data, so it is not an independent signal. No developer press release or news item gives a date.
Developer: Only the project-LLC filing name appears (LBNL, ercotqueue.com, GridGlasses). No parent or operating company is identified. The Vesper Energy / Katy BESS article does not name this project, so I did not link it.
Status: LBNL and ercotqueue.com (1 active, 0 dropped) show it active, while two interconnection.fyi snippets say withdrawn. There is no dated withdrawal event or news confirmation, so I kept LBNL's status and flagged the conflict.
About
Generated Apr 10, 2026 · Predates Jun 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Ochoa Energy Storage II project is a proposed 501.72 MW battery storage project located in Waller County, Texas. The developer is Ochoa Energy Storage II LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0235, with a queue entry date of April 15, 2024, and a proposed commercial operation date of January 1, 2029. The project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for the project is Tap 138kV 44420 Katy - 44230 Flewellen. The project has appeared in recent news coverage regarding energy storage developments in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jun 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Waller
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Ochoa Energy Storage II LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 44420 Katy - 44230 Flewellen
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- POI Substation
- Katy Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.