Maddox Solar (ERCOT-27INR0234) — Project Summary

Queue ID
ERCOT-27INR0234
Capacity
101.3 MW
Technology
Solar
Status
active
Location
Grayson, TX
Region
ERCOT
Developer
Industrial Lima Project LLC
IA Status
Facility Study

Maddox Solar

ERCOT-27INR0234BetaActiveSolarERCOTLBNL + Live

101.3 MW generation in Grayson, TX · In queue since May 2024 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.3 MW

Capacity

1

Components

Solar

2y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 10m

Facilities Study50%
Queue EntryMay 9, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-01

Queue history
27INR0234 · 30 monthly ERCOT reports, Apr 2024 – Sep 2026

Projected COD moved

3 times

Jan 2027 → Mar 2029

Net change

+26 months

first report to latest

Capacity

103 → 101 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 9, 2024
Facilities study approvedApr 8, 2025
Interconnection agreement signedSep 2, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activitycorporate_restructuringEnlit World · 2025-07-25

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Apr 1, 2028
Differs from queue: Mar 1, 2029From queue filing
Developer in saved assessment
Industrial Lima Project LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedMay 2024Latest in this assessment

Entered ERCOT queue and began Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of April 2028. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Industrial Lima Project LLC' is available. No news coverage or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell entity.

Status: LBNL shows active queue status in Facility Study phase. No news coverage found to provide additional ground-truth on project advancement or delays.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Maddox Solar is a proposed 101.3 MW solar generation project located in Grayson County, Texas. The developer is Industrial Lima Project LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0234, with a queue entry date of May 9, 2024, and a proposed commercial operation date of April 1, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV.

The Maddox Solar project has been the subject of recent news coverage, with seven articles published across industry, grid, and regulatory categories.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Grayson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Industrial Lima Project LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV

Data Source

LBNL + Live

CompanyXcel EnergyEnlit World · 2025-07-25
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.