Corvus Solar (ERCOT-27INR0126) — Project Summary

Queue ID
ERCOT-27INR0126
Capacity
201.5 MW
Technology
Solar
Status
active
Location
Webb, TX
Region
ERCOT
Developer
Corvus Solar, LLC
IA Status
IA Executed

Corvus Solar

ERCOT-27INR0126BetaActiveSolarERCOTLBNL + Live

201.5 MW generation in Webb, TX · In queue since February 2024 · Proposed COD November 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.5 MW

Capacity

1

Components

Solar

2y 9m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 5m

IA → COD

3y 4m

Total Duration

1y 5m

Construction75%
Queue EntryFeb 7, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-11-12

Queue history
27INR0126 · 33 monthly ERCOT reports, Jan 2024 – Sep 2026

Projected COD moved

1 time

Jul 2027 → Nov 2028

Net change

+16 months

first report to latest

Capacity

200 → 202 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 7, 2024
Facilities study approvedAug 31, 2026
Interconnection agreement signedJul 31, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 12, 2028
From queue filing
Developer in saved assessment
Corvus Solar, LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed July 2025, project in pre-construction phase targeting late 2028 operation
Financing
Not recorded

Milestones in this assessment

IA executedJul 31, 2025

Interconnection Agreement executed with ERCOT

COD targetNov 12, 2028Latest in this assessment

Proposed commercial operation date per ERCOT queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of November 2028. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'Corvus Solar, LLC' as developer. No news coverage or corporate announcements found to identify if this is a shell entity or operating company, or to reveal any parent organization.

Status: LBNL shows IA executed on 2025-07-31, indicating the project has secured interconnection rights and is progressing through development milestones toward construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Corvus Solar, LLC is a proposed 200.9 MW solar generation project located in Webb County, Texas. The project, developed by Corvus Solar, LLC, entered the ERCOT interconnection queue on February 7, 2024, under queue ID ERCOT-27INR0126. The proposed commercial operation date is November 12, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV Cenzio (#80219) - Lobo (#80220). The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Corvus Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV Cenzio (#80219) - Lobo (#80220)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.