Grapefruit Solar (ERCOT-27INR0118) — Project Summary

Queue ID
ERCOT-27INR0118
Capacity
291.4 MW
Technology
Solar
Status
suspended
Location
Hidalgo, TX
Region
ERCOT
Developer
Grapefruit Solar LLC
IA Status
IA Executed

Grapefruit Solar

ERCOT-27INR0118BetaSuspendedSolarERCOTLBNL + Live

291.4 MW generation in Hidalgo, TX · In queue since February 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

291.4 MW

Capacity

1

Components

Solar

2y 9m

In Queue

IA Executed

IA Phase

Signed Apr 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 2m

IA → COD

3y 8m

Total Duration

1y 2m

Suspended75%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 10, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-12-31

Queue history
27INR0118 · 31 monthly ERCOT reports, Feb 2024 – Aug 2026

Projected COD moved

2 times

May 2027 → Dec 2028

Net change

+19 months

first report to latest

Capacity

301 → 291 MW

changed in the reports

Latest stage

IA signed

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 27, 2024
Facilities study approvedAug 31, 2026
Interconnection agreement signedApr 10, 2025
On ERCOT's inactive listSep 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
Grapefruit Solar LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed April 2025, project remains in active queue with no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedApr 10, 2025Latest in this assessment

Interconnection Agreement executed with ERCOT

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent news or press releases found to validate or update this target date.

Developer: Only LBNL filing entity 'Grapefruit Solar LLC' is available. No press releases or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell LLC.

Status: LBNL shows IA executed on 2025-04-10, indicating the project has secured interconnection rights. No news coverage found to provide additional status updates beyond queue filing.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Grapefruit Solar is a proposed 291.4 MW solar generation project located in Hidalgo County, Texas. The development project is being advanced by Grapefruit Solar LLC and consists of a single solar photovoltaic component. It is planned to connect to the grid at the North Edinburg (Bus #8905) – Reforzar (Bus #80078) 345 kV point of interconnection.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier ERCOT-27INR0118. It entered the queue on February 27, 2024, and an interconnection agreement was executed on April 10, 2025. The proposed commercial operation date is December 31, 2028. Despite the executed agreement, the project's current queue status is listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Grapefruit Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

North Edinburg (Bus #8905) - Reforzar (Bus # 80078) 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.