Grapefruit Solar
291.4 MW generation in Hidalgo, TX · In queue since February 2024 · Proposed COD December 2028
291.4 MW
Capacity
1
Components
Solar
2y 9m
In Queue
IA Executed
IA Phase
Signed Apr 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 2m
IA → COD
3y 8m
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2028-12-31
Projected COD moved
2 times
May 2027 → Dec 2028
Net change
+19 months
first report to latest
Capacity
301 → 291 MW
changed in the reports
Latest stage
IA signed
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ERCOT
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent news or press releases found to validate or update this target date.
Developer: Only LBNL filing entity 'Grapefruit Solar LLC' is available. No press releases or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell LLC.
Status: LBNL shows IA executed on 2025-04-10, indicating the project has secured interconnection rights. No news coverage found to provide additional status updates beyond queue filing.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Grapefruit Solar is a proposed 291.4 MW solar generation project located in Hidalgo County, Texas. The development project is being advanced by Grapefruit Solar LLC and consists of a single solar photovoltaic component. It is planned to connect to the grid at the North Edinburg (Bus #8905) – Reforzar (Bus #80078) 345 kV point of interconnection.
The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier ERCOT-27INR0118. It entered the queue on February 27, 2024, and an interconnection agreement was executed on April 10, 2025. The proposed commercial operation date is December 31, 2028. Despite the executed agreement, the project's current queue status is listed as suspended.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hidalgo
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Grapefruit Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
North Edinburg (Bus #8905) - Reforzar (Bus # 80078) 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Grapefruit Solar
Data-driven briefing on Grapefruit Solar — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.