Two Barbaras BESS (ERCOT-27INR0109) — Project Summary

Queue ID
ERCOT-27INR0109
Capacity
217.16 MW
Technology
Battery
Status
active
Location
Montgomery, TX
Region
ERCOT
Developer
Two Barbaras BESS
IA Status
IA Executed

Two Barbaras BESS

ERCOT-27INR0109BetaActiveBatteryERCOTLBNL + Live

217.16 MW storage in Montgomery, TX · In queue since March 2024 · Proposed COD January 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

217.16 MW

Capacity

1

Components

Battery

2y 8m

In Queue

IA Executed

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

3y 3m

Total Duration

1y 7m

Construction75%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 1, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2029-01-04

Queue history
27INR0109 · 31 monthly ERCOT reports, Mar 2024 – Sep 2026

Projected COD moved

3 times

Feb 2027 → Jan 2029

Net change

+23 months

first report to latest

Capacity

200 → 217 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 22, 2024
Interconnection agreement signedOct 1, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jan 4, 2029
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — IA executed October 2025, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 1, 2025Latest in this assessment

Interconnection Agreement executed per LBNL queue data

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of January 2029. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'Two Barbaras BESS' as developer, which appears to be a project-specific LLC. No news coverage or corporate announcements found to identify the parent operating company or actual developer behind this entity.

Status: LBNL shows active status with interconnection agreement executed in October 2025. No news coverage found to provide additional ground-truth status updates.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Two Barbaras BESS project is a proposed 217.16 MW battery storage project located in Montgomery County, Texas. The developer is listed as Two Barbaras BESS. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0109, with a queue entry date of March 22, 2024, and a proposed commercial operation date of January 4, 2029. The project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is the Tap 138 kV Pinehurst (#46240) _x0013_ Mill Creek (#44850) Line. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Montgomery

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Two Barbaras BESS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV Pinehurst (#46240) – Mill Creek (#44850) Line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.