Guadalupe Battery Storage Project
210.5 MW storage in Guadalupe, TX · In queue since November 2023 · Proposed COD May 2030
210.5 MW
Capacity
1
Components
Battery
3 years
In Queue
Facility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 6m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-05-30
Projected COD moved
1 time
May 2027 → May 2030
Net change
+36 months
first report to latest
Capacity
211 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT interconnection queue as 27INR0093, Facility Study stage
cleanview.coResearch sources and reasoning (3 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/27INR0093/guadalupe-battery-storage-project-
- cleanview.co/planned-battery-projects/TX/27INR0093/guadalupe-battery-storage-project-
- interconnection.fyi/projects/state/TX/guadalupe-county
Commercial operation date: Cleanview aggregator shows April 2027 expected online date, which is 3 years earlier than LBNL's 2030-05-30 filing. LBNL queue date of Nov 2023 suggests the 2030 target may reflect early-stage interconnection study assumptions rather than current developer timeline.
Developer: No press releases or corporate announcements found identifying a parent company or operating entity beyond the LBNL filing name. Guadalupe Power Partners, LP appears to be the project entity without public signals of a larger parent organization.
Status: LBNL status of 'Active' at Facility Study stage is consistent with lack of construction or financing news. Project remains in early interconnection process.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Guadalupe Battery Storage Project is a proposed 210.5 MW battery storage project located in Guadalupe County, Texas. The project, developed by Guadalupe Power Partners, LP, is interconnected within the Electric Reliability Council of Texas (ERCOT) region, identified by queue ID ERCOT-27INR0093. The project entered the ERCOT interconnection queue on November 14, 2023, and has a proposed commercial operation date of May 1, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is # 7044 Marion 345kV. The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Guadalupe
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Guadalupe Power Partners, LP
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
# 7044 Marion 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Guadalupe Battery Storage Project
Data-driven briefing on Guadalupe Battery Storage Project — fleet, generation, financial, and news signals.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.