Tumbleweed Storage
507.2 MW generation in Borden, TX · In queue since October 2023 · Proposed COD December 2027
507.2 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
Projected COD moved
0 times
Dec 2027 → Dec 2027
Net change
0 months
first report to latest
Capacity
507 → 507 MW
changed in the reports
Latest stage
Screening started
last listed Apr 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Research sources and reasoning (4 recorded sources)
low confidence at research time
- hecateenergy.com/projects/
- interconnection.fyi/project/ercot-27inr0087
- sonomacleanpower.org/uploads/documents/soma_public_v1.pdf
- svcleanenergy.org/wp-content/uploads/svce_rdtv3_30mmt_na_conforming_75_public_v1.xlsx
Commercial operation date: Sonoma Clean Power's Standard LSE Plan (Nov 2022) documents a Tumbleweed Storage project with COD in April 2026, approximately 20 months earlier than LBNL's December 2027 target. This appears to be a different Tumbleweed Storage project (69 MW in Kern County, owned by LS Power) rather than the Hecate Energy project in Borden County.
Developer: LBNL filing uses project-specific LLC 'Hecate Energy Tumbleweed Storage LLC'. Hecate Energy's official project page lists 'Tumbleweed Storage' as an in-development project, confirming Hecate Energy as the parent operating company.
Status: LBNL status 'active' with IA status 'Facility Study' is consistent with Hecate Energy's website listing the project as 'In Development'. No evidence of construction start or withdrawal.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Tumbleweed Storage (queue ID ERCOT-27INR0087) is a proposed energy development project in Borden County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Hecate Energy Tumbleweed Storage LLC and has a total proposed capacity of 507.2 MW. Although the queue lists its technology as Solar+Battery, its only specified component is battery storage, which accounts for the full 507.2 MW. The project is classified as a generation project and would connect at the 59905 Faraday 345 kV point of interconnection.
The project entered the ERCOT interconnection queue on October 4, 2023, and has a proposed commercial operation date of December 1, 2027. Its interconnection agreement status is listed as "Facility Study," indicating it has reached the facility study phase of the interconnection process. The project's current queue status is listed as suspended.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Apr 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Borden
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Tumbleweed Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
59905 Faraday 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Faraday Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Obtain a complete list of Hecate Energy's operating assets, including in-service dates, to accurately identify plants added since 2023.
Structured data lookup for Hecate Energy with rankings and aggregations.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.