Supra Wind (ERCOT-27INR0063) — Project Summary

Queue ID
ERCOT-27INR0063
Capacity
205.86 MW
Technology
Wind
Status
active
Location
Hardeman, TX
Region
ERCOT
Developer
NextEra Energy Interconnection Holdings, LLC
IA Status
Facility Study

Supra Wind

ERCOT-27INR0063BetaActiveWindERCOTLBNL + Live

205.86 MW generation in Hardeman, TX · In queue since July 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.86 MW

Capacity

1

Components

Wind

3y 4m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Facilities Study50%
Queue EntryJul 10, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-23

Queue history
27INR0063 · 39 monthly ERCOT reports, Jul 2023 – Sep 2026

Projected COD moved

0 times

Dec 2027 → Dec 2027

Net change

0 months

first report to latest

Capacity

206 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 10, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 23, 2027
From queue filing
Developer in saved assessment
NextEra Energy
Filed as NextEra Energy Interconnection Holdings, LLC
Status at research time
Active
Active — Facility Study stage, no public announcements on construction timeline or financing
Financing
Not recorded

Milestones in this assessment

IA executedJul 2023Latest in this assessment

Entered ERCOT queue as 27INR0063, currently in Facility Study phase

ercotqueue.com
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-27inr0063
  2. ercotqueue.com/project/27INR0063
  3. ercotqueue.com/developer/nextera

Commercial operation date: Only LBNL queue snapshot provides a COD of 2027-12-23. No news articles or press releases found discussing this project; all search results relate to Toyota Supra automotive wind deflectors and NASCAR wind tunnels, not the energy project.

Developer: LBNL filing uses 'NextEra Energy Interconnection Holdings, LLC' which is NextEra's standard project-holding entity. The parent operating company is NextEra Energy, a major renewable developer.

Status: LBNL shows 'active' status in Facility Study phase. No news coverage found to indicate construction activity, financing, or status changes. Third-party queue trackers (ercotqueue.com) assign 5% build-chance, suggesting early-stage development.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Supra Wind is a proposed wind generation project with a total capacity of 205.86 MW. The project, located in Hardeman County, Texas, is being developed by NextEra Energy Interconnection Holdings, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0063, with a queue entry date of July 10, 2023, and a proposed commercial operation date of December 23, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 205.86 MW of wind generation capacity. Supra Wind has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hardeman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Interconnection Holdings, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap #6101 Riley 7A to #60505 Edithcla 7B 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.