Solar Star Rhome Storage
220.7 MW storage in Wise, TX · In queue since April 2023 · Proposed COD September 2029
220.7 MW
Capacity
1
Components
Battery
3y 7m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 5m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-27
Projected COD moved
1 time
Mar 2027 → Sep 2029
Net change
+30 months
first report to latest
Capacity
221 → 226 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Cleanview reports expected online date of March 2027
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/planned-battery-projects/TX/27INR0040/solar-star-rhome-storage
- cleanview.co/power-projects/planned/battery-storage-projects/texas/27INR0040/solar-star-rhome-storage
- interconnection.fyi/project/ercot-27inr0040
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
Commercial operation date: Cleanview (a specialized queue-tracking platform) reports expected online date of March 2027, which is 2.5 years earlier than LBNL's 2029-09-27 filing date. LBNL queue dates for Facility Study stage projects are typically stale projections.
Developer: LBNL lists 'Solar Star Rhome Storage' as developer, which is a project-specific LLC. No press releases, corporate announcements, or ownership information found in search results to identify the parent operating company.
Status: LBNL status is 'active' at Facility Study stage. No contradictory signals found in research; project appears to be progressing through interconnection studies without public milestones yet.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Solar Star Rhome Storage is a proposed 220.7 MW battery storage project located in Wise County, Texas. The project, developed by Solar Star Rhome Storage, is currently in the ERCOT interconnection queue as entry ERCOT-27INR0040, with a queue entry date of April 19, 2023. The proposed commercial operation date is March 31, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.
The project consists of 220.7 MW of battery storage capacity. It is planned to connect to the 576 RHOME 138kV point of interconnection. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wise
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Solar Star Rhome Storage
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
576 RHOME 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Solar Star Rhome Storage
Data-driven briefing on Solar Star Rhome Storage — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.