Panhandle Flagship Storage (ERCOT-27INR0025) — Project Summary

Queue ID
ERCOT-27INR0025
Capacity
371.7 MW
Technology
Solar+Battery
Status
active
Location
Carson, TX
Region
ERCOT
Developer
Panhandle Solar Group Operating Company LLC
IA Status
IA Executed

Panhandle Flagship Storage

ERCOT-27INR0025BetaActiveBatteryBatteryERCOTLBNL + Live

371.7 MW generation in Carson, TX · In queue since March 2023 · Proposed COD June 2031

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

371.7 MW

Capacity

1

Components

Battery

3y 8m

In Queue

IA Executed

IA Phase

Signed Aug 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 5m

IA → COD

5y 10m

Total Duration

2y 5m

Construction75%
Queue EntryMar 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 28, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2031-06-30

Queue history
27INR0025 · 43 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

1 time

Dec 2027 → Jun 2031

Net change

+42 months

first report to latest

Capacity

352 → 372 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 13, 2023
Facilities study approvedJul 11, 2025
Interconnection agreement signedAug 28, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2031
From queue filing
Developer in saved assessment
Panhandle Solar Group Operating Company LLC
From queue filing
Status at research time
IA Executed
Active in the ERCOT queue (Carson County, 345 kV Railhead Substation). The interconnection agreement was executed 2025-08-28 and the target in-service date is mid-2031. No construction or financing news was found.
Financing
Not recorded

Milestones in this assessment

IA executedAug 28, 2025Latest in this assessment

Interconnection agreement signed for the 372 MW storage project at Railhead 345 kV. The date comes from the LBNL record, and amcompute confirms the agreement status.

amcompute.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. amcompute.com/data-center-site-finder/texas
  2. ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf
  3. ercotqueue.com/developer/panhandle-solar-group-operating-company-llc
  4. interconnection.fyi/projects/state/TX/carson-county

Commercial operation date: The LBNL proposed COD is 2031-06-30. The May 2026 ERCOT RPG document lists the same 6/30/2031 date for 27INR0025, and amcompute shows 'in service 2031-06'. These are all queue-data echoes, and no developer press release or news item gives an independent date.

Developer: Only the LBNL/ERCOT filing entity appears in the sources (ercotqueue lists 4 active projects under it). No press release or news item names a parent or operating company. The unrelated Hutchinson County and Potter County articles do not tie this entity to a sponsor.

Status: LBNL shows status active with IA Executed on 2025-08-28, and amcompute lists 'Agreement signed'. No source indicates withdrawal, suspension or construction start.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Panhandle Flagship Storage is a proposed 371.7 MW battery storage project located in Carson County, Texas. The project, developed by Panhandle Solar Group Operating Company LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0025, with a queue entry date of March 13, 2023. The proposed commercial operation date is June 30, 2031.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 345 kV Railhead Substation. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Carson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Panhandle Solar Group Operating Company LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Railhead Substation (RAILHEAD #79005)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Railhead Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.