Panhandle Flagship Solar 3
260.3 MW hybrid in Hutchinson, TX · In queue since March 2023 · Proposed COD June 2031
260.3 MW
Capacity
1
Components
Solar
3y 8m
In Queue
IA Executed
IA Phase
Signed Aug 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 5m
IA → COD
5y 10m
Total Duration
2y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–30 months
Proposed COD: 2031-06-30
Projected COD moved
1 time
Dec 2027 → Jun 2031
Net change
+42 months
first report to latest
Capacity
263 → 260 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ERCOT
interconnection.fyiResearch sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-27inr0024
- ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx
- ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
- ercotqueue.com/project/27INR0024
- cleanview.co/planned-solar-projects/TX/27INR0024/panhandle-flagship-solar-3
Commercial operation date: Only LBNL provides a COD target of June 2031. No press releases, financing announcements, or construction updates found in search results to validate or contradict this date. The IA was executed in August 2025, which is recent and suggests the project is progressing, but no developer-announced timeline exists.
Developer: All sources consistently identify 'Panhandle Solar Group Operating Company LLC' as the developer. No parent company, acquisition, or operating entity distinction found in any search results. The entity name suggests it may be a project-specific LLC, but no evidence of a larger parent organization emerged.
Status: LBNL shows 'active' status with IA executed in August 2025, which is very recent. No news coverage of construction start, financing, or development milestones found despite multiple search queries. Project appears to be in early post-IA phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Panhandle Flagship Solar 3 project is a proposed 260.3 MW solar generation facility in Hutchinson County, Texas. The project, being developed by Panhandle Solar Group Operating Company LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0024, with a queue entry date of March 13, 2023. The proposed commercial operation date is June 30, 2031, and the project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 260.3 MW of solar generation capacity. It has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hutchinson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Panhandle Solar Group Operating Company LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024) connects to Station 2 (27INR0023) via a 4.4 mile internal tie line. Station 2 connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 connects to POI
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Panhandle Flagship Solar 3
Data-driven briefing on Panhandle Flagship Solar 3 — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
ATI
Data-driven briefing on ATI — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.