Dundee East A Wind (ERCOT-27INR0005) — Project Summary

Queue ID
ERCOT-27INR0005
Capacity
523.73 MW
Technology
Wind
Status
active
Location
Baylor, TX
Region
ERCOT
Developer
Felix 2, LLC
IA Status
IA Executed

Dundee East A Wind

ERCOT-27INR0005BetaActiveWindERCOTLBNL + Live

523.73 MW generation in Baylor, TX · In queue since January 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

523.73 MW

Capacity

1

Components

Wind

3y 10m

In Queue

IA Executed

IA Phase

Signed Feb 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 1m

IA → COD

2y 10m

Total Duration

2y 1m

Construction75%
Queue EntryJan 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 21, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-12-31

Queue history
27INR0005 · 46 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

1 time

Jul 2027 → Dec 2027

Net change

+5 months

first report to latest

Capacity

307 → 524 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 3, 2023
Interconnection agreement signedFeb 21, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2y 3m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · 2024-06-18Magnolia Tribune · 2024-08-07

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2027
From queue filing
Developer in saved assessment
Felix 2, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue with an IA executed 2025-02-21; ercotqueue.com notes the facility study (FIS) is still pending, with an 87% build-chance estimate. No construction or financing news found.
Financing
Not recorded

Milestones in this assessment

IA executedFeb 21, 2025Latest in this assessment

Interconnection agreement executed per the LBNL snapshot; the interconnection.fyi page tracks the same queue record.

interconnection.fyi
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-27inr0005
  2. ercotqueue.com/project/27INR0005
  3. cleanview.co/power-projects/planned/wind-farms/texas/27INR0005/dundee-east-a-wind
  4. interconnection.fyi/project/ercot-27inr0598

Commercial operation date: Only the LBNL/ERCOT filing gives a date (proposed COD 2027-12-31). interconnection.fyi, ercotqueue.com and cleanview.co ("Expected online 2027") appear to mirror the same queue data. No developer press release or news article gives an independent target.

Developer: Every queue-tracker source lists Felix 2, LLC. No source ties it to a parent company. The news-extracted AES/Delta Wind Farm facts describe a different project (184.5 MW, already online, apparently in Mississippi), so I discarded them. The AES Four Horizons project in Baylor County is not linked to this queue ID.

Status: LBNL shows active with an executed IA, and ercotqueue.com is consistent with that. The separate 'Dundee East A Wind Placeholder' (27INR0598) is withdrawn, but it is a different queue record.

Project lifecycle
as of 2024-08-07
PhaseOnlineEnergy Industry Review · 2021-08-04
OperationalYesMagnolia Tribune · 2024-08-07
TechnologyWindMagnolia Tribune · 2024-08-07
DeveloperAES Corporation±Magnolia Tribune · 2024-08-07
PPA offtakerAmazonMagnolia Tribune · 2024-08-07
COD achievedReportedMagnolia Tribune · 2024-08-07

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Dundee South A Wind project is a proposed wind generation facility with a total capacity of 307.23 MW. Located in Baylor County, Texas, the project is being developed by Felix 2, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0005, with a queue entry date of January 3, 2023, and a proposed commercial operation date of December 31, 2027. The project's interconnection status is currently in the Facility Study phase and will connect to the 345 kV Riley Substation operated by AEP.

The Dundee South A Wind project has been the subject of recent news coverage, with four articles published related to industry trends, grid infrastructure, and project development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Baylor

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Felix 2, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Riley Substation (#6101); AEP

Data Source

LBNL + Live

DeveloperAES Corporation±Magnolia Tribune · 2024-08-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ELECTRAW_1_2
POI Substation
Riley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.