Dundee East A Wind
523.73 MW generation in Baylor, TX · In queue since January 2023 · Proposed COD December 2027
523.73 MW
Capacity
1
Components
Wind
3y 10m
In Queue
IA Executed
IA Phase
Signed Feb 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
2y 10m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2027-12-31
Projected COD moved
1 time
Jul 2027 → Dec 2027
Net change
+5 months
first report to latest
Capacity
307 → 524 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed per the LBNL snapshot; the interconnection.fyi page tracks the same queue record.
interconnection.fyiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-27inr0005
- ercotqueue.com/project/27INR0005
- cleanview.co/power-projects/planned/wind-farms/texas/27INR0005/dundee-east-a-wind
- interconnection.fyi/project/ercot-27inr0598
Commercial operation date: Only the LBNL/ERCOT filing gives a date (proposed COD 2027-12-31). interconnection.fyi, ercotqueue.com and cleanview.co ("Expected online 2027") appear to mirror the same queue data. No developer press release or news article gives an independent target.
Developer: Every queue-tracker source lists Felix 2, LLC. No source ties it to a parent company. The news-extracted AES/Delta Wind Farm facts describe a different project (184.5 MW, already online, apparently in Mississippi), so I discarded them. The AES Four Horizons project in Baylor County is not linked to this queue ID.
Status: LBNL shows active with an executed IA, and ercotqueue.com is consistent with that. The separate 'Dundee East A Wind Placeholder' (27INR0598) is withdrawn, but it is a different queue record.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Dundee South A Wind project is a proposed wind generation facility with a total capacity of 307.23 MW. Located in Baylor County, Texas, the project is being developed by Felix 2, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0005, with a queue entry date of January 3, 2023, and a proposed commercial operation date of December 31, 2027. The project's interconnection status is currently in the Facility Study phase and will connect to the 345 kV Riley Substation operated by AEP.
The Dundee South A Wind project has been the subject of recent news coverage, with four articles published related to industry trends, grid infrastructure, and project development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Baylor
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Felix 2, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV Riley Substation (#6101); AEP
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ELECTRAW_1_2
- POI Substation
- Riley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.